FIREPLACE CLEARANCES

FIREPLACE CLEARANCES

The fireplace may be placed directly on a combustible floor, against a combustible wall at marked clearances, or on a raised wooden platform.

If the fireplace is to be installed on a raised wooden platform, the platform must be a continuous level surface. The fireplace must be secured in place so it cannot shift positions. The nailing flanges on the sides of the firebox make securing it to the framing easy. They were designed to allow the installation of 1/2" wallboard or plywood flush with the face of the fireplace.

Only the header (see Figure 2) may rest on the standoffs on top of the firebox.

When the firebox is installed over carpeting, vinyl tile, or

any combustible material other than wood flooring, it must be installed on a metal or wood panel extending its full width and depth. Alternatively, the carpeting, vinyl tile, etc. may be removed beneath the fireplace before installing.

COMBUSTIBLE MATERIALS MUST NOT BE INSTALLED OVER OR TOUCH ANY BLACK PAINTED SURFACE. DO NOT BLOCK HEAT CIRCULATING AIR OUTLETS. DOING

SO MAY RESULT IN POTENTIAL FIRE HAZARDS.

1.Sidewall Clearances: Clearances from the side of the fireplace opening to any adjacent combustible wall

should not be less than 7"right side, 7” left side.

2.Ceiling Clearances: The ceiling height should not be less than 42" from the top of the fireplace opening.

INSTALLING THE FIREBOX

This list of specific instructions will help you make certain that every installation operation is performed correctly. Complete the installation steps in the sequence shown.

LOCAL BUILDING CODES SHOULD BE CONSULTED IN ALL CASES AS TO THE PARTICULAR REQUIREMENTS CONCERNING THE

INSTALLATION OF FACTORY BUILT FIREPLACES. Select the location for the fireplace by taking into consideration the factors previously outlined in the “Choosing the Location.” See page 6.

Framing the Firebox

The width of the framed opening must be 31 7/8". The height of the framed opening must be 32 3/16". The entire fireplace can be elevated above the floor to achieve a raised hearth effect. This can be done by adding a small platform to achieve the desired height.

NOTE: The wiring for the lower blower must be installed during the framing stage. The nailing flanges on both sides were designed to allow the installation of 1/2" wallboard or plywood flush with the face of the fireplace.

When the framing is inside, the outside wall will be insulated. If the framing or chase is outside, thin insulation should be used in the framing on the back, sides, and top. The bottom should be insulated with a hard insulating board. This will prevent cold from going into the chase through the fireplace to the living space.

Install the Firebox

Install the firebox into the framed opening by placing it directly in front of the opening and sliding it into the proper position.

Level the Firebox

Check the level of the firebox on the top edge of the fireplace face. Shim if necessary.

Secure the Firebox

Secure the fireplace to the framing. The nailing flanges on the firebox will make securing the firebox to the frame quick and easy. Use appropriate size nails or screws to secure the firebox.

LEFT

FRONT

RIGHT

Page 8

Image 10
Contents Manufacturer NEW BUCK CORPORATION P.O. Box MODEL FP-327-ZCNEW BUCK CORPORATION 8000 Highway 226 South Spruce Pine, NCPage TABLE OF CONTENTS Page SECTION I SAFETY INFORMATION WARNINGS Page Page GAS LINE SECTION ZERO CLEARANCE INSTALLATIONCHOOSING THE LOCATION FOR YOUR FIREPLACE DRAFTS7 1/2 Fireplace and Framing Dimensions inches3 1/4 PageInstall the Firebox INSTALLING THE FIREBOXFIREPLACE CLEARANCES Framing the FireboxFINISHING YOUR FIREPLACE CLEARANCESMANTEL 3/4 FLAT SURFACE MANTEL PROFILES FOR ZERO CLEARANCE CABINETMUST BE FOLLOWED MANTEL 3/4 FLAT SURFACEINSTALLATION OF MODEL FP - 327- ZC WITH OPTIONAL WOODEN MANTELREAR OF HEATER 1/2 WOOD SCREWSTOP MANTEL MANTEL BASESECTION AFTER MARKET MOBILE HOME INSTALLATION PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIRFLOW FOR HEATER LOCATIONVent-freeheater VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGVENTILATION AIR FROM OUTDOORS GAS CONNECTION FLAMESEE DIAGRAM ON PAGE PLACEMENT OF LOGSGAS PRESSURE CHECK 3 1 2 Figure PLACEMENT OF LOGSPage LIGHTING INSTRUCTIONS MILLIVOLT VALVE ITT FOR YOUR SAFETY, READ BEFORE LIGHTINGWHAT TO DO IF YOU SMELL GAS REMOVE METAL CONNECTOR ROCKER SWITCHBEFORE INSTALLING THERMOSTAT PageTHERMO--COUPLEPILE IGNITOR ELECTRODEPILOT BURNER PageMANUAL LIGHTING PROCEDURE THERMOSTAT CONTROL OPERATIONLIGHTING INSTRUCTIONS MODULATING VALVEMAXITROL FOR YOUR SAFETY, READ BEFORE LIGHTINGfor “LOW” LIGHTING INSTRUCTIONSto IGNITE and for “HIGH”O.D.S PILOT BURNER IGNITER ELECTRODE THERMO-COUPLETO TURN OFF GAS TO APPLIANCE MANUAL LIGHTING PROCEDURE THERMOSTAT CONTROL OPERATIONBURNER FLAME CHECKNATURAL PILOT PROPANE PILOTWIRING DIAGRAM Rating 120 volts/60HZ/0.54 Amps NOTE #PESBRO84 Blower Model FP-327-ZCPage IMPORTANT SAFEGUARDS CLEANINGTROUBLE SHOOTING Air in gas lines when OBSERVED PROBLEM OBSERVED REPAIR PARTS SERVICINGPARTS LIST Maxitrol ValveBLOWN UP VIEW OF BURNER ASSEMBLY PageITT Valve PARTS LISTBLOWN UP VIEW OF BURNER ASSEMBLY PagePage Page