Heat & Glo LifeStyle BE-41 manual Framing the Fireplace, Framing Dimensions

Page 10

Step 2. Framing the Fireplace

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommo- date wall coverings and fireplace facing material. The dia- gram below shows framing reference dimensions.

CAUTION: MEASURE FIREPLACE DIMENSIONS AND VERIFY FRAMING METHODS AND WALL COVERING DETAILS BEFORE FRAMING.

Shows center of 12” x 12” vent framing holes for top and rear venting. The center of the hole is one (1) inch (25.4mm) above the center of the horizontal vent pipe.

A.

...............

42”

B.

......... 38

1/2”

C.

...............

22”

D.

...............

42”

E.

......... 25

5/8”

Framing should be constructed of 2 X 4 lumber or heavier.

B

C

E D

A

1/2” CLEARANCE FROM BACK OF FIREPLACE TO COMBUSTIBLE

1/2” CLEARANCE FROM BOTH SIDES OF FIREPLACE TO COMBUSTIBLE

FRAMING

MEMBER

0” CLEARANCE

0” CLEARANCE TO

FRAMING MEMBER

Figure 3. Framing Dimensions

10

Image 10
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents Service Parts BE-41 Service Parts List / Liste des pièces de rechange LOGS-BE41Appliance Certification High Altitude InstallationsInstallation Codes CertificationPre-install Preparation Introducing the Heat-N-Glo Gas FireplacesGAS Line Access ANY Such Action MAY Possibly Cause a Fire HazardLocating the Fireplace Fireplace Dimensions, LocationsSpace Requirements Clearance Requirements Framing Dimensions Framing the FireplaceAT Each Joint Identifying Vent Components Installing the Vent SystemVent System Approvals Terminations KitsMAX .4 M Vertical VentingStraight Up Vertical Venting Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO Elbows Venting with Three 3 90 Elbows Venting with three 90 elbows+ H 1 FT Venting Out the Top Vent Installing Vent ComponentsVenting Out the Rear Vent Attach the First Vent Component to the Starting CollarsInstall Support Brackets Continue Adding Vent Components12 Hole and Vent Pipe Vent Termination Attic Firestop=VENT Terminal =AIR Supply Inlet Minimum for vinyl clad soffitsMinimum Height from Roof to Lowest Discharge Opening Leveling and Securing of a Fireplace Positioning, Leveling, Securing the FireplaceGas Control Systems Standing Pilot Ignition SystemGas Supply Line Gas Pressure RequirementsOptional Accessories Wiring the FireplaceFor Standing Pilot Ignition Wiring Appliance Requirements Remote Wall SwitchFinishing Installing Trim, Logs, and Ember MaterialInstalling the Trim Hearth ExtensionsBefore Positioning the LogsLog Placement Tabs Lighting the Fireplace After the InstallationBefore Lighting the Fireplace TemperedFireplace Maintenance Important Turn OFF the GAS Before Servicing Your Fireplace