Heat & Glo LifeStyle BE-41 manual Vent Termination, Attic Firestop

Page 21

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 22. Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NOTE: Keep insulation away from the vent pipe at least 1 inch (25mm).

 

NAILS (4 REQUIRED)

 

RAFTER

CEILING

 

 

CEILING FIRESTOP

Figure 23.

Attic Firestop

C. Vent Termination

For Horizontal Terminations - To attach and secure the termination to the last section of horizontal vent:

Rotate and interlock the ends as described at the begin- ning of the Installing Vent Components section.

The termination kit should pass through the wall firestops from the exterior of the building.

Adjust the termination cap to its final exterior position on the building.

!WARNING: THETERMINATIONCAPMUSTBEPO- SITIONEDSOTHATTHEARROWISPOINTINGUP.

For roundcap termination kits:

Use the exterior pipelock hole on the round flange of the wall firestop to secure the vent pipe in place.

For trapezoidal cap termination kits:

Using screws secure the cap to the exterior wall through the flanges in the cap.

!WARNING: THE BOTTOM OF THE VENT TERMINATION CAP MUST BE A MINIMUM

OF 12 INCHES (305 MM) ABOVE GROUND LEVEL (GRADE). THE TOP OF THE CAP MUST BE A MIN- IMUM OF 18 INCHES (457 MM) BELOW COMBUS-

TIBLE MATERIAL, SUCH AS A DECK. THE SIDE OF THE CAP MUST BE A MINIMUM OF 6 INCHES (152 MM) AWAY FROM A PARALLEL OUTSIDE WALL. VENTING TERMINALS SHALL NOT BE RE- CESSED INTO A WALL OR SIDING. SEE THE FOL- LOWING DIAGRAM FOR VENT TERMINATION CLEARANCES.

ROUND CAP TERMINATION

PERFORATION CANNOT BE

INSIDE THE WALL

71/2"

(191mm)

MINIMUM

TRAPEZOID CAP TERMINATION

7 1/4" (184mm)

Figure 24. Round & Trapezoid Termination Caps

21

Image 21
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents Service Parts LOGS-BE41 BE-41 Service Parts List / Liste des pièces de rechangeInstallation Codes High Altitude InstallationsAppliance Certification CertificationIntroducing the Heat-N-Glo Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard GAS Line AccessFireplace Dimensions, Locations Locating the FireplaceSpace Requirements Clearance Requirements Framing the Fireplace Framing DimensionsAT Each Joint Vent System Approvals Installing the Vent SystemIdentifying Vent Components Terminations KitsVertical Venting MAX .4 MStraight Up Vertical Venting Venting with One 90 Elbow Venting with ONE 1 90 ElbowVenting with TWO Elbows Venting with three 90 elbows Venting with Three 3 90 Elbows+ H 1 FT Venting Out the Rear Vent Installing Vent ComponentsVenting Out the Top Vent Attach the First Vent Component to the Starting CollarsContinue Adding Vent Components Install Support Brackets12 Hole and Vent Pipe Attic Firestop Vent TerminationMinimum for vinyl clad soffits =VENT Terminal =AIR Supply InletMinimum Height from Roof to Lowest Discharge Opening Gas Control Systems Positioning, Leveling, Securing the FireplaceLeveling and Securing of a Fireplace Standing Pilot Ignition SystemGas Pressure Requirements Gas Supply LineFor Standing Pilot Ignition Wiring Appliance Requirements Wiring the FireplaceOptional Accessories Remote Wall SwitchInstalling the Trim Installing Trim, Logs, and Ember MaterialFinishing Hearth ExtensionsPositioning the Logs BeforeLog Placement Tabs Before Lighting the Fireplace After the InstallationLighting the Fireplace TemperedImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace Maintenance