Heat & Glo LifeStyle BE-41 manual Installing Vent Components, Venting Out the Rear Vent

Page 18

B. Installing Vent Components

After determining which set of starting collars will be used (top or rear), follow venting instructions accordingly.

Venting Out the Rear Vent

Remove the installed rear seal cap from the rear starting collars by cutting the strap at each end. (see Figure 15). Follow the vent configuration tables accordingly.

Remove the insulation from the REAR five inch flue, pull the heat shield out from outside of the firebox.

!WARNING: THE TOP HEAT SHIELD (INSIDE THE FIREBOX) MUST REMAIN ATTACHED IF THE VENT SYSTEM IS ATTACHED TO THE REAR STARTING COLLARS. SEE FIGURE 15.

Venting Out the Top Vent

Remove the two screws in the top vent collar seal cap and remove the top vent collar seal cap and two pieces of in- sulation inside the top two starting collars (See Figure 15).

Remove the heat shield from inside the TOP five inch flue from outside of the firebox.

The glass must be taken off again for positioning the logs when the unit is finally installed in place and finished around it. Re-install the glass door. Attach vent system to the top starting collars.

!WARNING: THE REAR VENT COLLAR SEAL CAP MUST REMAIN ATTACHED TO THE REAR VENT COLLARS IF THE VENT SYSTEM IS AT- TACHED TO THE TOP STARTING COLLARS.

!WARNING: FAILURE TO REMOVE INSULATION IN THE SET OF COLLARS YOU ARE USING COULD CAUSE A FIRE.

!WARNING: YOU MUST LEAVE THE INSULATION IN PLACE IN THE SET OF COLLARS YOU ARE NOT USING.

If your vertical vent component is over 10 feet, you may want to install the vertical baffle (located in the bag containing the install manual) to improve flame appearance. Center the vertical baffle on the 5” flue being used, and with self tapping screws secure the baffle to the inside of the firebox.

Venting Out Rear

Venting Out Top

SEAL

SEAL

 

CAP

CAP

 

HEAT

INSULATION

 

SHIELD

 

 

DISCARD BOTH

 

 

PIECES and

 

 

HEAT SHIELD

HEAT

DISCARD

 

SHIELD

INSULATION

 

 

and

 

 

HEAT SHIELD

 

 

Insert screwdriver

 

 

or similar object

 

 

here to remove cap.

CUT

 

 

 

 

HERE

Figure 15

 

 

1.Attach the First Vent Component to the Starting Collars

To attach the first vent component to the starting collars of the fireplace:

Apply a 3/8 inch (9.5mm) bead of stove cement around the 5 inch (127mm) fireplace starting collar.

Make sure that the fiberglass rope gasket supplied with the fireplace seals between the first 8-5/8 inch (219mm) vent component and the outer fireplace wrap.

Lock the vent components into place by sliding the con- centric pipe sections with four (4) equally spaced interior beads into the fireplace collar or previously installed com- ponent end with four (4) equally spaced indented sections.

When the internal beads of each 8-5/8 inch (219mm) outer pipe line up, rotate the pipe section clockwise about one-quarter (1/4) turn. The vent pipe is now locked together.

The first 90° elbow installed in the vent system of a rear venting fireplace MUST BE in a vertical position.

STARTING

COLLAR

STOVE

SEALANT

BEAD

FIRST VENT

COMPONENT

1 INCH (25.4mm)

Figure 16. Attaching the First Vent Component to the Starting Collars

!WARNING: A 3/8 INCH (9.5 MM) BEAD OF STOVE CEMENT MUST BE PLACED AROUND

THE 5 INCH (127 MM) FIREPLACE STARTING COL-

LAR BEFORE ATTACHING THE FIRST VENT COM- PONENT. FAILURE TO SEAL THIS JOINT MAY CAUSE THE FIREPLACE TO OPERATE IMPROPERLY.

!WARNING: ENSURE THAT THE FIBERGLASS ROPE GASKET SUPPLIED WITH THE

FIREPLACE SEALS BETWEEN THE FIRST VENT COMPONENT AND THE OUTER FIREPLACE WRAP.

If the installation is for a termination cap attached directly to the fireplace, skip to the sections, Install Firestops and Vent Termination.

18

Image 18
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents Service Parts BE-41 Service Parts List / Liste des pièces de rechange LOGS-BE41Appliance Certification High Altitude InstallationsInstallation Codes CertificationPre-install Preparation Introducing the Heat-N-Glo Gas FireplacesGAS Line Access ANY Such Action MAY Possibly Cause a Fire HazardFireplace Dimensions, Locations Locating the FireplaceSpace Requirements Clearance Requirements Framing Dimensions Framing the FireplaceAT Each Joint Identifying Vent Components Installing the Vent SystemVent System Approvals Terminations KitsVertical Venting MAX .4 MStraight Up Vertical Venting Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO Elbows Venting with Three 3 90 Elbows Venting with three 90 elbows+ H 1 FT Venting Out the Top Vent Installing Vent ComponentsVenting Out the Rear Vent Attach the First Vent Component to the Starting CollarsInstall Support Brackets Continue Adding Vent Components12 Hole and Vent Pipe Vent Termination Attic Firestop=VENT Terminal =AIR Supply Inlet Minimum for vinyl clad soffitsMinimum Height from Roof to Lowest Discharge Opening Leveling and Securing of a Fireplace Positioning, Leveling, Securing the FireplaceGas Control Systems Standing Pilot Ignition SystemGas Supply Line Gas Pressure RequirementsOptional Accessories Wiring the FireplaceFor Standing Pilot Ignition Wiring Appliance Requirements Remote Wall SwitchFinishing Installing Trim, Logs, and Ember MaterialInstalling the Trim Hearth ExtensionsBefore Positioning the LogsLog Placement Tabs Lighting the Fireplace After the InstallationBefore Lighting the Fireplace TemperedFireplace Maintenance Important Turn OFF the GAS Before Servicing Your Fireplace