Heat & Glo LifeStyle BE-41 manual Table of Contents

Page 3

TABLE OF CONTENTS

 

Safety and Warning Information

2

Service Parts Lists

4

Section 1: Approvals and Codes

6

Approval Listings and Codes

6

Appliance Certification

6

Installation Codes

6

High Altitude Installations

6

Section 2: Getting Started

7

Introducing the Heat-N-Glo Gas Fireplaces

7

Pre-installation Preparation

7

Section 3: Installing the Fireplace

9

Step 1

Locating the Fireplace

9

Step 2

Framing the Fireplace

10

Step 3

Installing the Vent System

12

 

A. Vent System Approvals

12

 

B. Installing Vent Components

18

 

C. Vent Termination

21

Step 4

Positioning, Leveling, and

 

 

Securing the Fireplace

24

Step 5

The Gas Control Systems

24

Step 6

The Gas Supply Line

25

Step 7

Gas Pressure Requirements

25

Step 8

Wiring the Fireplace

26

Step 9

Finishing

27

Step 10

Installing Trim, Logs, and Ember Material

27

 

Installing the Trim

27

 

Positioning the Logs

27

 

Placing the Ember Material

30

Step 11

Before Lighting the Fireplace

30

Step 12 Lighting the Fireplace

30

After the Installation

30

Section 4: Maintaining and Servicing Your Fireplace

31

3

Image 3
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents Service Parts LOGS-BE41 BE-41 Service Parts List / Liste des pièces de rechangeCertification High Altitude InstallationsInstallation Codes Appliance CertificationIntroducing the Heat-N-Glo Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard GAS Line AccessFireplace Dimensions, Locations Locating the FireplaceSpace Requirements Clearance Requirements Framing the Fireplace Framing DimensionsAT Each Joint Terminations Kits Installing the Vent SystemVent System Approvals Identifying Vent ComponentsVertical Venting MAX .4 MStraight Up Vertical Venting Venting with One 90 Elbow Venting with ONE 1 90 ElbowVenting with TWO Elbows Venting with three 90 elbows Venting with Three 3 90 Elbows+ H 1 FT Attach the First Vent Component to the Starting Collars Installing Vent ComponentsVenting Out the Rear Vent Venting Out the Top VentContinue Adding Vent Components Install Support Brackets12 Hole and Vent Pipe Attic Firestop Vent TerminationMinimum for vinyl clad soffits =VENT Terminal =AIR Supply InletMinimum Height from Roof to Lowest Discharge Opening Standing Pilot Ignition System Positioning, Leveling, Securing the FireplaceGas Control Systems Leveling and Securing of a FireplaceGas Pressure Requirements Gas Supply LineRemote Wall Switch Wiring the FireplaceFor Standing Pilot Ignition Wiring Appliance Requirements Optional AccessoriesHearth Extensions Installing Trim, Logs, and Ember MaterialInstalling the Trim FinishingPositioning the Logs BeforeLog Placement Tabs Tempered After the InstallationBefore Lighting the Fireplace Lighting the FireplaceImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace Maintenance