Heat & Glo LifeStyle BE-41 manual Hole and Vent Pipe

Page 20

Position the firestops on both sides of the hole previ- ously cut and secure the firestops with nails or screws.

The heat shields of the firestops MUST BE placed to- wards the top of the hole.

Continue the vent run through the firestops.

12"

(305mm)

12"

(305mm)

1" (25.4 mm)

VENT PIPE

Figure 19. 12" x 12" Hole and Vent Pipe

HEAT SHIELD

TRIM HEAT SHIELD IF TOO LONG, ADD TO SHIELD IF TOO SHORT

EXTERIOR

FIRESTOP

INTERIOR

FIRESTOP

Figure 20. Heat Shield, Interior & Exterior Firestops

For Vertical Runs - One ceiling firestop is REQUIRED at the hole in each ceiling through which the vent passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the verti- cal vent component.

Mark the ceiling to establish the centerpoint of the vent.

Drill a hole or drive a nail through this centerpoint.

Check the floor above for any obstructions, such as wir- ing or plumbing runs.

Reposition the fireplace and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut an 11-inch X 11-inch (280mm X 280mm) hole through the ceiling, using the centerpoint previously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

11" (280 mm)

11" (280mm)

 

 

CHIMNEY

 

HOLE

NEW

EXISTING CEILING

JOISTS

FRAMING

 

MEMBERS

 

CEILING

 

Figure 21. 11" x 11" Hole & New Framing Members

20

Image 20
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents Service Parts BE-41 Service Parts List / Liste des pièces de rechange LOGS-BE41High Altitude Installations Installation CodesAppliance Certification CertificationPre-install Preparation Introducing the Heat-N-Glo Gas FireplacesGAS Line Access ANY Such Action MAY Possibly Cause a Fire HazardSpace Requirements Clearance Requirements Fireplace Dimensions, LocationsLocating the Fireplace Framing Dimensions Framing the FireplaceAT Each Joint Installing the Vent System Vent System ApprovalsIdentifying Vent Components Terminations KitsStraight Up Vertical Venting Vertical VentingMAX .4 M Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO Elbows Venting with Three 3 90 Elbows Venting with three 90 elbows+ H 1 FT Installing Vent Components Venting Out the Rear VentVenting Out the Top Vent Attach the First Vent Component to the Starting CollarsInstall Support Brackets Continue Adding Vent Components12 Hole and Vent Pipe Vent Termination Attic Firestop=VENT Terminal =AIR Supply Inlet Minimum for vinyl clad soffitsMinimum Height from Roof to Lowest Discharge Opening Positioning, Leveling, Securing the Fireplace Gas Control SystemsLeveling and Securing of a Fireplace Standing Pilot Ignition SystemGas Supply Line Gas Pressure RequirementsWiring the Fireplace For Standing Pilot Ignition Wiring Appliance RequirementsOptional Accessories Remote Wall SwitchInstalling Trim, Logs, and Ember Material Installing the TrimFinishing Hearth ExtensionsBefore Positioning the LogsLog Placement Tabs After the Installation Before Lighting the FireplaceLighting the Fireplace TemperedFireplace Maintenance Important Turn OFF the GAS Before Servicing Your Fireplace