Vermont Casting D232 Operating Instructions, General Glass Information, Louvre Removal

Page 18
OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS

GENERAL GLASS INFORMATION

Only glass approved for use in with this product may be used for replacement.

1.The use of substitute glass will void all product warranties.

2.Care must be taken to avoid breakage of the glass.

Under no circumstances should this fireplace be operated without the front glass or with a broken glass. Replacement of the glass (with gasket) as supplied by the manufacturer should be done by a licenced qualified service person.

LOUVRE REMOVAL

D232

To remove louvres first remove the two (2) screws (Fig. 31) fastening the louvre assembly to the fireplace. Lift the louvre assembly straight out sliding the back guides out of the fireplace body. (To reinstall, reverse).

Front View

Screws

Fig. 31

TRIM REMOVAL

D232

1.Remove the two (2) outer 3/8" nuts holding the frame window brass trim in place. (Fig. 32)

2.Remove the frame window brass trim by moving it straight forward.

GLASS REMOVAL

D232

1 . Remove frame window brass trim (See Trim Removal section)

2.Remove remaining bottom 3/8" nut at the bottom of the frame window.

3.Remove 3/8" nut from each side of the frame window (Fig. 32).

4.Remove frame window by pulling it forward and up.

 

GLASS

 

FRAME

OUTER NUTS

DRAWING 2

 

DRAWING 1

 

Side Nuts

 

BOTTOM NUT

Fig. 32

- 18 -

Image 18
Contents Free-Standing Direct Vented Fireplaces FOR YOUR SAFETYFOR YOUR SAFETY MODEL D232TABLE OF CONTENTS Crimped Ends Venting ComponentsLOCATING YOUR GAS FIREPLACE INSTALLATION AND OPERATING INSTRUCTIONSCLEARANCE TO COMBUSTIBLES PLEASE REVIEW THE FOLLOWINGMODEL D232 A K C D EG F BI J H FIREPLACE DIMENSIONSPREPARATION GAS SPECIFICATIONSGAS LINE INSTALLATION D232 CERTIFIED TOVALVE INSTALLATION OF REMOTE SWITCH FOR RN/RP GAS VALVEON/OFF SWITCH OR MILLIVOLT THERMOSTATF= clearance to outside comer see next page GENERAL VENTING INFORMATIONLocation of Vent Termination G= clearance to inside comer see next pageTermination Clearances D CC EGENERAL INFORMATION ON ASSEMBLING THE VENT PIPES CRIMPED END PIPESTWIST LOCK PIPES Screw HolesTotal VERTICAL SIDEWALL INSTALLATIONSVERTICAL SIDEWALL APPLICATIONS 270oSIDEWALL VENTING GRAPH Dimensions in FeetTO USE THE VENT GRAPH HORIZONTAL DIMENSIONSTEP VENT PIPE ASSEMBLYBEAD OF SEALANT STEPSTEP BELOW GRADE INSTALLATIONSSTEP STEPVERTICAL THROUGH THE ROOF APPLICATIONS run if the vertical exceedsTO INSTALL VERTICAL VENTING VERTICAL THRU THE ROOF APPLICATIONSCRIMPED ENDS VENTING COMPONENTS TWIST LOCK VENTING COMPONENTS LOUVRE REMOVAL OPERATING INSTRUCTIONSGENERAL GLASS INFORMATION TRIM REMOVALGLASS CLEANING INSTALLATION OF LOGS & BURNER LAVA ROCK MATERIALClean glass after first two weeks of operation CLEANING PROCEDURE MAINTENANCEFLAME ADJUSTMENT RN/RP MODELS FLAME CHARACTERISTICSLIGHTING INSTRUCTIONS FOR YOUR SAFETY READ BEFORE LIGHTINGLIGHTING AND OPERATING INSTRUCTIONS TO TURN OFF GAS TO FIREPLACESTART TROUBLE SHOOTING THE GAS CONTROL SYSTEMHONEYWELL MILLIVOLT VALVE CHECKPOSSIBLE CAUSES SYMPTOMSIT NOVA 820 MILLIVOLT VALVE CORRECTIVE ACTIONREPLACEMENT PARTS LIST D232DESCRIPTION FREESTANDING REPLACEMENT PARTS D232#1 - COMPLETE LOG SET REMOTE CONTROL OPTIONSFAN KIT - FK24 Page LIMITED WARRANTY & EXTENDED LIFE TIME PROTECTION For Gas Appliance ProductsCFM Majestic, Inc