BUILT-IN FIREPLACE INSTALLATION
Built-In Fireplace Installation
Frame in rough opening. Use dimensions shown in Figure 10 for a conventional rough opening. Use dimensions shown in Figure 11 for corner rough opening. Be sure to provide gas line for fireplace and electrical power for
1.Attach two (2) nailing flanges to firebox sides with two (2) 10 x 1/2" screws for each nailing flange.
2.Gas line connections must be made at this time. When facing the appliance the gas supply will enter on
3.Insert fireplace into enclosure.
4.Attach nailing flanges to framing with a screw or nail.
5.Finished wall surface will be flush to the leading edge of fireplace top and sides.
6.Installation of
Installation of Trim
1.Lower bottom louver.
2.Remove screen from fireplace.
3.Remove top louver from fireplace [two (2) Phillips screws].
4.Attach right and lift trim to fireplace. Use two (2) Phillips screws for each side.
5.Attach trim top to fireplace with two (2) Phillips screws.
6.Reattach top louver to fireplace using two (2) Phillips screws.
7.Reattach screen to fireplace.
8.Raise bottom louver.
Rough Opening for Installing in Wall
D
PROJECTETION
ALLA
INST
H | |
FLUS | TION |
ALLA | |
INST |
|
| M BACK |
|
| |
1” TO | 6” FRO | m | 26 | 3/4” |
|
|
| ||
m TO 152m |
|
| ||
25m |
|
| (680mm) | |
ELECTRICAL |
| |||
|
|
| ||
| ACLE |
|
|
|
RECEPT |
|
|
|
| 4” | (102mm) | Y | ||
|
|
|
| ||
|
|
| UPPL | ||
|
| S S |
|
| |
| GA |
|
|
| |
11 | 1/4” |
|
|
|
|
|
| 23 |
|
| |
(286mm) |
| 1/4” | (591mm) | ||
|
|
|
|
|
Figure 10
Rough Opening for Installing in Corner
Figure 11
Figure 12
Page 11 |