Empire Comfort Systems VF24FP3-1, VF24FP2-1 Check 750 Millivolt System Operation, Remote Receiver

Page 17

WIRING

Label all wires prior to disconnection when servicing controls.

VF24FP3-1 Wiring Diagram

Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

Millivolt thermopile is self powered, gas valve does not require 110 volts. Maximum length of 20 feet of 16 AWG to conductor wires is to be used with all optional switches.

Use the two leads (Brown and Black/Red wires) to attach optional components.

Check 750 Millivolt System Operation

Millivolt system and all individual components may be checked with a millivolt meter 0-1000 MV range.

Remote Receiver

Use the following steps to place the remote receiver adjacent to the gas valve.

Attention: The remote receiver bracket is not used in this installation.

1. The remote receiver can not be placed behind the gas valve and burner assembly.

2. When facing the appliance, the remote receiver must be placed to the right of the gas valve and burner assembly.

Note: Do not let remote control receiver come in contact with burner assembly.

On circulating vent-free firebox, install remote control receiver behind bottom louver.

Refer to remote control installation and operating instructions for more details on remote control.

Figure 20

20248-2-0806

Page 17

Image 17
Contents Installation Instructions Table of Contents Do not Tamper with Pilot Light Safety Important Safety InformationCarbon Monoxide Poisoning MAY Lead to DeathLP-GAS Warning Odor Safety Information for Users of LP-GASIntroduction Water Vapor a BY-PRODUCT of Unvented Room Heaters SpecificationsOutdoors Ventilation Air From Inside BuildingVentilation AIR Ventilation Air From OutdoorsRecommended Gas Pipe Diameter GAS SupplyCombustible Material ClearancesInstalling Fireplace in Mantel Installation of Fireplace Into MantelInstallation of Trim Built-In Fireplace Installation BUILT-IN Fireplace InstallationRough Opening for Installing in Wall Rough Opening for Installing in CornerPlacement of Glowing Embers Rock Wool LOG PlacementReplacement Loose Material glowing embers Part Number Operation INSTRUCTIONS/FLAME AppearanceWhat to do if YOU Smell GAS VF24FP3-1 Lighting InstructionsLighting Instructions VF24FP2-1 Lighting InstructionsVF24FP2-1 Pilot Pilot Flame CharacteristicsVF24FP3-1 Pilot Main Burner and Thermostat Operation Bedroom Installation VF24FP2-1 OnlyVF24FP2-1 VF24FP3-1 Main Burner OperationRemote Receiver Check 750 Millivolt System OperationHeater produces a whistling noise when main burner is lit Gas odor even when control knob is in OFF positionAppliance produces unwanted odors Appliance shuts off during use. Pilot stays onIndex Part Description Number Parts ListHOW to Order Repair Parts Parts View Parts List for EHL-24-1, Brick Liner KIT Optional Brick Liner Installation InstructionsInstalling Optional Brick Liner EHL-24-1 Installing Optional Blower VFS-BK Optional Blower Installation Instructions20248-2-0806 Optional Blower Installation Instructions Oiling Blower Motor WiringVFS-BK Parts List VPF24SS Stainless Steel Parts List and Parts View for Optional Trim KitsService Notes