ULTRA FLAME DV “0” Clearance Fireplace
Top of fireplace (spacer) | 0" |
Back of fireplace | 0" |
Sides of fireplace | 0" |
Bottom of fireplace | 0" |
Vent pipe: | 2" |
Wall perpendicular to the standard |
|
surround | 1/2" |
Mantel (from upper part of the |
|
standard surround) | 6" if the projection is up to 6" |
| 12" if the projection is over 6" |
NOTE: If you install decorative posts to support the mantel shelf, they can be located 1/2" away from the side of the fireplace surround, no matter how big they are.
INSTALLATION OF THE UNIT
•Move the ULTRA FLAME to the desired position. Mark the location for the gas inlet pipe and the location where the vent pipes will go through the wall. Remove the appliance.
•Route a 3/8" minimum NPT iron pipe gas line to the desired location.
•Install a shutoff valve to the gas line. Tighten securely using a pipe joint compound.
NOTE: The valve includes two ¼” tappings for test gauge connection. You may need, however, to install a 1/8” plugged tapping between the gas line and the connection point to the fireplace, if it is required by local codes.
•Move the ULTRA FLAME to the desired position and secure in place.
•Connect gas line to the fireplace using listed connectors.
14