Drolet DG05437/DG05447 manual Vent Terminal, Basement Installation

Page 20
VENT TERMINAL, BASEMENT INSTALLATION

ULTRA FLAME DV “0” Clearance Fireplace

VENT TERMINAL, STRAIGHT OUT AND CORNER INSTALLATION

Seal with RTV silicone between 8" diameter pipe and radiation shield inside and outside the building to prevent air passage. Install the vent terminal as shown. Insert the wall plate inside the 8" pipe and screw it to the wall using the six #10 2-1/2" wood screws supplied. Place the 5" locking band around the inner connector and insert the exhaust pipe. Seal the joint with RTV silicone. Secure the pipe in place with one #10 1/2" metal screw. Install the casing and secure with metal screws provided. Install the cover by inserting the tab in the slot on the wall plate and secure with metal screws.

Seal around the terminal to prevent any water from leaking into the house. Seal both ends of the slot where the cover was inserted in wall plate with RTV silicone.

VENT TERMINAL, BASEMENT INSTALLATION

Seal with RTV silicone between 8" diameter pipe and radiation shield inside and outside the building to prevent air infiltration.

Attach the 4" flexible pipe with the locking band and with RTV silicone.

Attach the wall plate with 4 wood screws # 10 x 2-1/2" (supplied).

Seal around the terminal to prevent water leakage into the house.

20

Image 20
Contents INSTALLATION AND OPERATING INSTRUCTIONS FOR YOUR SAFETYFOR YOUR SAFETY WHAT TO DO IF YOU SMELL GAS DIRECT VENT 0 CLEARANCE GAS FIREPLACESPECIFICATIONS LIGHTING PROCEDUREMAINTENANCE INSTRUCTIONS GLASS MAINTENANCEGENERAL INFORMATION KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCEDO NOT MODIFY THIS APPLIANCE SPECIFICATIONS LIGHTING PROCEDURE OPERATIONBEFORE LIGHTING THE FIRST FIREBLOWER WALL THERMOSTATSHUTDOWN MAINTENANCE INSTRUCTIONS GLASS MAINTENANCENever clean this glass with abrasive cleaners Use only a cleaner recommended by your dealerBURST DISC REPLACEMENT TOP, FRONT AND SIDE VIEWS FRONT VIEWTOP VIEW SIDE VIEWPOSITIONING THE FIREPLACE INSTALLATIONSAFETY NOTICE VENT TERMINAL LOCATION MINIMUM CLEARANCE TO COMBUSTIBLES INSTALLATION OF THE UNIT WARNING DO NOT USE OPEN FLAME TO CHECK LEAKS VENTING KITS STRAIGH OUTCORNER BASEMENT1 STRAIGHT OUT INSTALLATION 2 CORNER INSTALLATION3 BASEMENT INSTALLATION VENTING SYSTEM ULTRA FLAME DV “0” Clearance FireplaceVENT TERMINAL, BASEMENT INSTALLATION VENT TERMINAL, ROOF INSTALLATION OPTIONAL BLOWER INSTALLATIONGLASS FRONT REMOVAL, CLEANING AND INSTALLATION BURNER REMOVAL AND INSTALLATIONEMBER KIT INSTALLATION LOG INSTALLATION LOUVRE INSTALLATION OPTIONAL REFRACTORY PANEL INSTALLATION 1.Remove the glass front assembly6.Install the glass front assembly ULTRA FLAME DV “0” Clearance FireplaceADJUSTMENTS Natural Gas Pressure SettingsPropane Pressure Settings ELEVATIONADJUSTING THE GAS PRESSURE Remember to replace all coversADJUSTING AIR SHUTTER WALL THERMOSTATREPLACEMENT PARTS OPTIONAL PARTSITEM DESCRIPTION ITEM DESCRIPTIONLIMITED 5 YEAR WARRANTY DROLET STOVES AND FIREPLACES INC