Drolet
DG05437/DG05447
manual
Operation, Before Lighting, Lighting Procedure, The First Fire
Specification
Install
Warranty
Maintenance
Lighting Procedure
Adjustments
Burst Disc Replacement
Safety
Page 6
Page 5
Page 7
Image 6
Page 5
Page 7
Contents
FOR YOUR SAFETY WHAT TO DO IF YOU SMELL GAS
INSTALLATION AND OPERATING INSTRUCTIONS
FOR YOUR SAFETY
DIRECT VENT 0 CLEARANCE GAS FIREPLACE
MAINTENANCE INSTRUCTIONS
SPECIFICATIONS
LIGHTING PROCEDURE
GLASS MAINTENANCE
GENERAL INFORMATION
KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE
DO NOT MODIFY THIS APPLIANCE
SPECIFICATIONS
BEFORE LIGHTING
LIGHTING PROCEDURE
OPERATION
THE FIRST FIRE
WALL THERMOSTAT
SHUTDOWN
BLOWER
Never clean this glass with abrasive cleaners
MAINTENANCE INSTRUCTIONS
GLASS MAINTENANCE
Use only a cleaner recommended by your dealer
BURST DISC REPLACEMENT
TOP VIEW
TOP, FRONT AND SIDE VIEWS
FRONT VIEW
SIDE VIEW
INSTALLATION
SAFETY NOTICE
POSITIONING THE FIREPLACE
VENT TERMINAL LOCATION
MINIMUM CLEARANCE TO COMBUSTIBLES
INSTALLATION OF THE UNIT
WARNING DO NOT USE OPEN FLAME TO CHECK LEAKS
CORNER
VENTING KITS
STRAIGH OUT
BASEMENT
1 STRAIGHT OUT INSTALLATION
2 CORNER INSTALLATION
3 BASEMENT INSTALLATION
VENTING SYSTEM
ULTRA FLAME DV “0” Clearance Fireplace
VENT TERMINAL, BASEMENT INSTALLATION
VENT TERMINAL, ROOF INSTALLATION
OPTIONAL BLOWER INSTALLATION
GLASS FRONT REMOVAL, CLEANING AND INSTALLATION
BURNER REMOVAL AND INSTALLATION
EMBER KIT INSTALLATION
LOG INSTALLATION
LOUVRE INSTALLATION
6.Install the glass front assembly
OPTIONAL REFRACTORY PANEL INSTALLATION
1.Remove the glass front assembly
ULTRA FLAME DV “0” Clearance Fireplace
Propane Pressure Settings
ADJUSTMENTS
Natural Gas Pressure Settings
ELEVATION
ADJUSTING THE GAS PRESSURE
Remember to replace all covers
ADJUSTING AIR SHUTTER
WALL THERMOSTAT
ITEM DESCRIPTION
REPLACEMENT PARTS
OPTIONAL PARTS
ITEM DESCRIPTION
LIMITED 5 YEAR WARRANTY
DROLET STOVES AND FIREPLACES INC
Related pages
All Procedure page
Common Welding Procedures for Lincoln Electric S350
Boil Out Procedure for Pitco Frialator E500D
Flashing Voltage Test Procedure for Lincoln Electric SVM194-A
Alternate Oil Drain Procedure for Snapper CP215517HV
COVERI?LATE Mounting Procedure for Lightolier IS:44224
General Operating Procedures for Toastmaster TRE36D
Step Procedure Pad Order Display Press the Preheat pad for Sharp R990J(S)
Packing Nut Adjustment Procedure for Graco Inc Indy-X Chop
Freight Claim Procedure for Ice-O-Matic GEM0650A/W
To replace the battery, follow the procedures below for Lenovo 4242X04
How does the
CTB50 compare
to other models?
Top
Page
Image
Contents