Drolet DG05437/DG05447 manual Basement Installation

Page 18
3) BASEMENT INSTALLATION

ULTRA FLAME DV “0” Clearance Fireplace

Add a spring spacer. The spring spacer must be located opposite the outside pipe joints to prevent puncturing of the inside pipe when the two sections of the outside pipe are screwed together.

Slip on the 90° x 8" elbow so that it faces your hole in the wall. Seal it with silicone and secure with screws.

Add a spring spacer.

Add sections of 8" diameter pipe and cut it to be flush with the outside face of the exterior wall, and install them to the 90° elbow, through the radiation shield.

Secure the 8" diameter pipe with screws and seal joints with silicone.

Cover the 8"diameter pipe with the insulation blanket and seal joint with aluminum tape.

Installation inside the house is now complete. The next step is to install the vent termination cap according the instructions in the next section.

3) BASEMENT INSTALLATION

Make a 10-1/2" x 10-1/2" opening in the wall at the desired location for the exterior wall.

Cut the radiation shield to length if necessary and install as shown. Secure with four #10 1” wood screws.

Install the vent pipe starting from the fireplace and working your way out.

NOTE: All joints must be sealed with RTV silicone, 315°C. (600°F) temperature resistance.

Attach the 4" flexible pipe on the fireplace with a locking band and seal with silicone. Cut to leave a 2-1/2" projection over the exterior wall.

Slip on the 45° elbow facing upward. Seal it with silicone and secure with screws.

Add a spring spacer. Spring spacers must be located opposite the outside pipes joints to prevent puncturing of the inside pipe when the two sections of the outside pipe are screwed together.

Add 8" diameter pipe sections, including the spring spacers, to attain the desired height. Secure with screws and seal with silicone and aluminum tape.

Slip on the 90° elbow and horizontally, the last section of 8" pipe. The pipe has to be cut to be flush with the outside face of the exterior wall. Then, install it through the radiation shield.

Secure the 8"diameter pipes with screws and seal joints with silicone.

Cover the 8"diameter pipe with the insulation blanket and seal joint with aluminum tape.

Installation inside the house is now complete. The next step is to install the vent termination cap according the instructions in the next section.

18

Image 18
Contents FOR YOUR SAFETY WHAT TO DO IF YOU SMELL GAS INSTALLATION AND OPERATING INSTRUCTIONSFOR YOUR SAFETY DIRECT VENT 0 CLEARANCE GAS FIREPLACEMAINTENANCE INSTRUCTIONS SPECIFICATIONSLIGHTING PROCEDURE GLASS MAINTENANCEGENERAL INFORMATION KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCEDO NOT MODIFY THIS APPLIANCE SPECIFICATIONS BEFORE LIGHTING LIGHTING PROCEDUREOPERATION THE FIRST FIREWALL THERMOSTAT SHUTDOWNBLOWER Never clean this glass with abrasive cleaners MAINTENANCE INSTRUCTIONSGLASS MAINTENANCE Use only a cleaner recommended by your dealerBURST DISC REPLACEMENT TOP VIEW TOP, FRONT AND SIDE VIEWSFRONT VIEW SIDE VIEWINSTALLATION SAFETY NOTICEPOSITIONING THE FIREPLACE VENT TERMINAL LOCATION MINIMUM CLEARANCE TO COMBUSTIBLES INSTALLATION OF THE UNIT WARNING DO NOT USE OPEN FLAME TO CHECK LEAKS CORNER VENTING KITSSTRAIGH OUT BASEMENT1 STRAIGHT OUT INSTALLATION 2 CORNER INSTALLATION3 BASEMENT INSTALLATION VENTING SYSTEM ULTRA FLAME DV “0” Clearance FireplaceVENT TERMINAL, BASEMENT INSTALLATION VENT TERMINAL, ROOF INSTALLATION OPTIONAL BLOWER INSTALLATIONGLASS FRONT REMOVAL, CLEANING AND INSTALLATION BURNER REMOVAL AND INSTALLATIONEMBER KIT INSTALLATION LOG INSTALLATION LOUVRE INSTALLATION 6.Install the glass front assembly OPTIONAL REFRACTORY PANEL INSTALLATION1.Remove the glass front assembly ULTRA FLAME DV “0” Clearance FireplacePropane Pressure Settings ADJUSTMENTSNatural Gas Pressure Settings ELEVATIONADJUSTING THE GAS PRESSURE Remember to replace all coversADJUSTING AIR SHUTTER WALL THERMOSTATITEM DESCRIPTION REPLACEMENT PARTSOPTIONAL PARTS ITEM DESCRIPTIONLIMITED 5 YEAR WARRANTY DROLET STOVES AND FIREPLACES INC