Enviro 50-927, C-10791 owner manual Table of Contents

Page 3

Table of Contents

Safety Precautions

2

Table of Contents

3

Codes And Approvals

4

Specifications

5

Dimensions

5

Rating Label Location

5

Operating Instructions

6

Pilot Lighting Instructions

6

Pilot Light

7

Air Shutter

7

Burner Lighting

8

Remote controls

8

Blower speed (Optional)

8

Maintenance And Service

9

Routine Maintenance

9

Cleaning The Glass

9

Cleaning The Firebox

9

Replacing the Glass

9

Cleaning Decorative Surfaces

10

Glass Door Removal

10

Fuel Conversion

11

Initial Installation

12

Introduction

12

Placement and Framing

12

Framing Mount Brackets

13

Corner Installation

13

Raised Fireplaces and Hearths

13

Mantle Clearances

14

Vent Termination Restrictions

15

Vent Parts and Terminal Clearances

16

Venting

16

Vent Configurations and Restrictor Settings

18

Horizontal Termination

19

Vertical Termination

20

Installation Of Electrical Wiring For The Optional Fan Kit

23

Electrical System For Thermostat

23

Gas Line Connection and Testing

24

Secondary Installation

25

Log Set and Ember Installation

25

Optional Ceramic Brick Panel Installation

28

Optional Fan Kit Installation

29

Trouble Shooting

31

Parts List

32

Parts Diagram

33

Warranty

34

Installation Data Sheet

35

3

Image 3
Contents R E C T V E N T F I R E P L a C E For Your SafetyGeneral Safety PrecautionsTable of Contents Codes And Approvals Vented GAS Fireplace Heater DV36 NG/LPGThis Enviro DV36 Fireplace Installation Options SpecificationsOperating Instructions For Your Safety Read BeforeBlue, the fireplace is getting too much Control Panel To Turn GAS Fireplace OFFMaintenance And Service Bottom latches for glass Never Operate Fireplace with the glass RemovedTo be Installed by a Qualified Service Agency only Qualified Installers only Initial InstallationDo not interfere with the structural integrity of the walls Top of unit to bottom of 10 25.4 cm mantle Vent Termination Restrictions Venting 51mm 76mm 41 3/4 Fireplace is cool or use welder’s gloves or Horizontal Vent Termination Possibility of a fireVertical Vent Termination AssembleRoof Pitch Minimum Height H Feet Meters Use of Wall Straps Installation of Electrical Wiring for the Optional FAN KIT To Test Valve Pressures GAS Line ConnectionEmpty firebox with grate and locator pins Secondary InstallationThird Stage Log Set Installation Complete log set-up with embers Never operate the fireplace with the glass door removedIs past the bottom of the baffle. Remove panel from firebox Turn off the gas control knob and allow the unit to coolKit Contents Hook Fan Tabs Over Grommets at Unit Back Installation of KitProblem Possible Cause Solution Trouble ShootingReference Part Description Part Number Parts ListParts Diagram Warranty To the DealerTo the Distributor Installation Data Sheet