Avalon Stoves Indoor Fireplace manual 8Installation, Hopper Extension Set-up

Page 8

8Installation

Hopper Extension Set-up

This pellet heater has a variable-height hopper. This allows the hopper to be lowered for smaller fireplaces. Follow the instructions below to set the correct hopper extension position.

Determine the correct hopper extension position following the directions below.

The unit will extend 14” into the fireplace. For setting the hopper, the maximum fireplace opening measurements have to be taken at 14” into the fireplace.

Hopper Extension Position

A (highest position)

25-3/4”

B (next highest)

24-1/2”

C etc...

23-3/8”

D etc...

22-1/4”

E etc...

21-1/8”

F (lowest position)

20”

Remove the hopper top following the directions below.

Hopper Top

Remove the hopper top by removing the screws holding it in place.

1/4" Nutdriver

NOTE: with the hopper top removed, the hopper walls may be removed.

Remove the hopper walls.

Travis Industries

4 0 5 0 5 2 5

1 0 0 - 0 1 1 4 4

Image 8 Contents
Astoria Bay Pellet Insert Travis Industries 5 0 5 2 0 0 1 1 4 2IntroductionIntroduction Important Information Table of Contents Safety Precautions Mobile Home 6Specifications Installation7 8Installation Hopper Extension Set-upInstallation9 Re-install the hopper walls following the directions below0Installation Installation1 Venting the Pellet StoveOutside Air used for combustion 2InstallationMobile Home Requirements Baffle Installation Restrictor Adjustment4Installation Surround Panel & Circuit Board InstallationInstallation into a Masonry Fireplace Hint6Installation Installation into a Factory Built Metal FireplaceSafety Notice Operation1Location of Controls Starting the Heater for the First TimeTwo Modes of Operation 8OperationLoading Pellets Manual Mode To Adjust the HeatTo Start To Shut Down0Operation Auto ModeTo Adjust Room Temperature or Start the Stove Adjusting the Fan Speed Operation2Maintenance Required Light 2OperationStart-Up Sequence Auger on LightManual Auger Button Power OutagesUsing a Pellet/Corn Mix with This Heater 4Maintenance Daily Maintenance whenever using the heaterInspect the Burn Make Sure Pellets are Not Piling UpCheck Firepot for Clinkers Maintenance2Cleaning the Firepot 6Maintenance Opening The DoorWeekly Maintenance or every 5 bags of pellets Clean the HopperClean the Heat Exchange Tubes Cleaning the Optional Plated SurfacesCheck Baffles, Ashbox, Ashpan, Dispose Ash If Necessary 8MaintenanceClean the Glass Remove the ashbox prior to conducting the service below Sweep Ash Into Ashpan0Maintenance Yearly Maintenance or every tonMaintenance3 Clean the Vent make sure the heater and vent is coolDoor Alignment 2MaintenanceDoor Seal Adjusting the Door Hinge and Latch Hinge AdjustmentReplacement Parts Check for Air Leaks Around the Door, Glass, and AshpanNormal Operating Sounds Covection FanSafety Label Serial NoLimited 7 Year Warranty Years 1 & 2 Coverage Parts & Labor8Optional Equipment ThermostatOptional Equipment ZC Kit 9 9 2 0 0 1 40Index