Aarrow Fires Becton 7 mk3, Becton Bunny installation manual Checklist, Installation Check List

Page 17

INSTALLATION CHECK LIST

CHECKLIST

Hearths, Fireplaces, Flues and chimneys

This checklist is to ensure hearths, fireplaces, flues and chimneys are satisfactory, and to show what you have done to comply with the

requirements of The Building Regulations 2000 Approved Document J 2002.

1.Building address, where work has been carried out.......................................................................................................................................

.........................................................................................................................................................................................................................

2.Identification of hearth, fireplace chimney or flue

3.Firing capability: solid fuel/gas/.

4.Intended type of appliance. State model and output.

5.Ventilation provisions for the appliance:

State type and area of permanently open vents.

6.Chimney or flue construction

a)State the type or make and whether new or existing.

b)internal flue size (and equivilent height, where calculated - natural draught gas appliances only).

c)If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and

state jointing materials used.

d)If an existing chimney has been refurbished with a new liner, type or make of liner fitted.

e)Details of flue outlet terminal and diagram reference.

Outlet Details:

Complies with:

f)Number and angle of bends.

g)Provision for cleaning and recommended frequency.

7. Hearth. Form of construction. New or existing?

8.Inspection and testing after completion Tests carried out by:

Tests and results

 

Flue

visual

inspection

sweeping

 

coring ball

 

smoke

 

Appliance (where included) spillage

I/we the undersigned confirm that the above details are correct. In my opinion, these works comply with the relevant requirements in Part J of Schedule 1 to the Building regulations.

Print name and title

....................................................................................................Profession

Capacity

Telephone

Address

Postcode

Signed

Date

Registered membership of..(e.g. CORGI, OFTEC, HETAS, NACE, NACS)............................................

Becton Bunny & Becton 7 mk3 Gas stoves

17

Image 17
Contents Becton MK Flaming Good Fires Installation ContentsGeneral Information Safety NoticesIntroduction Certification Introduction Important NoticesStatutory Requirements Fire Dimensions Operating Instructions Technical DataMax. Heat Setting Min. Heat SettingPositioning the rear lining Operating Instructions Fitting the Lining PanelsOperating Instructions Arranging the Coals Safety Notice Please see Safety Notices ref. Coal setOperating Instructions Lighting & Controlling the Fire Operating Instructions Fitting the Feet Installation Installing the FireFlue System Nacs National Association of Chimney Sweeps telephone 01785See d See cFire Location Graph 1.Combustible Shelf Clearances Test Sequence Installation Hearth RequirementsConnecting the GAS Supply Flame failure device testing Installation Fire TestingInstallation Check List ChecklistServicing Detail of Pilot Assembly Servicing Door Trim Fire Door Glass & Seal Replacement of the Door TrimEnsure the appliance is cold Lifting the door off its hingesRegular Service Servicing Burner AssemblyCleaning Outer Surfaces Servicing Annual ServiceCleaning the Glass See Safety Notices ref coal setServicing Fault DiagnosisAdd on Canopies Accessories and OptionsSpare Parts General Components Becton Bunny & Becton 7 mk3 Gas stoves Becton Bunny & Becton 7 mk3 Gas stoves Visual Aid Bunny Becton Part Description Spare PartsAFGS080 AFGS080 Control Door Handle Assembly AFGS1085AFGS025 Becton 7 mk3 Lining Kit AFGS1072Customer Registration GuaranteeDate of Visit Company Work Carried Out Signature Service RecordBecton Final Factory Check List ’ve checked it and it’s O.K