Aarrow Fires Becton Bunny, Becton 7 mk3 installation manual Servicing, Fault Diagnosis

Page 22

SERVICING

START

FAULT DIAGNOSIS

Does the pilot ignite?

No

Is the gas supply turned on?

Yes

Is the supply pressure correct?

Yes

Is their a spark at the electrode?

Yes

Check to ensure the pilot assy is not obstructed or faulty

Yes

No

Turn gas on

No

Correct pressure

No

Check piezo igniter

Does the pilot stay alight?

No

Is their air in the system?

No

Is the thermocouple o.k.?

Yes

Is pilot injector obstructed?

No

Has spillage monitoring system been activated?

Yes

Yes

Purge system

No

Correct

alignment or

replace

Yes

Clean

No

Does the main burner light?

No

Is the main injector blocked?

No

Is the flue blocked?

No

Confirm supply pressure is correct

Yes

Fire satisfactory

Yes

Clean and replace as necessary

Carry out smoke test

Yes

Investigate flue systems

Check all pipe connections check main valve magnet

22

Becton Bunny & Becton 7 mk3 Gas stoves

Image 22
Contents Becton MK Flaming Good Fires Contents InstallationIntroduction Safety NoticesGeneral Information Statutory Requirements Introduction Important NoticesCertification Max. Heat Setting Operating Instructions Technical DataFire Dimensions Min. Heat SettingOperating Instructions Fitting the Lining Panels Positioning the rear liningSafety Notice Please see Safety Notices ref. Coal set Operating Instructions Arranging the CoalsOperating Instructions Lighting & Controlling the Fire Operating Instructions Flue System Installation Installing the FireFitting the Feet Nacs National Association of Chimney Sweeps telephone 01785See c See dFire Location Graph 1.Combustible Shelf Clearances Connecting the GAS Supply Installation Hearth RequirementsTest Sequence Installation Fire Testing Flame failure device testingChecklist Installation Check ListServicing Detail of Pilot Assembly Ensure the appliance is cold Fire Door Glass & Seal Replacement of the Door Trim Servicing Door Trim Lifting the door off its hingesServicing Burner Assembly Regular ServiceCleaning the Glass Servicing Annual ServiceCleaning Outer Surfaces See Safety Notices ref coal setFault Diagnosis ServicingSpare Parts General Components Accessories and OptionsAdd on Canopies Becton Bunny & Becton 7 mk3 Gas stoves Becton Bunny & Becton 7 mk3 Gas stoves Spare Parts Visual Aid Bunny Becton Part DescriptionControl Door Handle Assembly AFGS1085 AFGS080 AFGS080Becton 7 mk3 Lining Kit AFGS1072 AFGS025Guarantee Customer RegistrationService Record Date of Visit Company Work Carried Out SignatureBecton ’ve checked it and it’s O.K Final Factory Check List