Aarrow Fires Becton Bunny, Becton 7 mk3 installation manual Servicing Detail of Pilot Assembly

Page 18

SERVICING

DETAIL OF PILOT ASSEMBLY

It is strongly recommended to leave the pilot on permanently. This will keep the fire and its components, including the ceramic coal set in a warmer state and assist ignition to the burner.

This in turn will reduce condensation in the chimney and any associated flue problems.

The pilot can be viewed through the L/H & centre front slots in the base matrix.

Fig. 10

18

Becton Bunny & Becton 7 mk3 Gas stoves

Image 18
Contents Becton MK Flaming Good Fires Contents InstallationSafety Notices IntroductionGeneral Information Introduction Important Notices Statutory RequirementsCertification Max. Heat Setting Operating Instructions Technical DataFire Dimensions Min. Heat SettingOperating Instructions Fitting the Lining Panels Positioning the rear liningSafety Notice Please see Safety Notices ref. Coal set Operating Instructions Arranging the CoalsOperating Instructions Lighting & Controlling the Fire Operating Instructions Flue System Installation Installing the FireFitting the Feet Nacs National Association of Chimney Sweeps telephone 01785See c See dFire Location Graph 1.Combustible Shelf Clearances Installation Hearth Requirements Connecting the GAS SupplyTest Sequence Installation Fire Testing Flame failure device testingChecklist Installation Check ListServicing Detail of Pilot Assembly Ensure the appliance is cold Fire Door Glass & Seal Replacement of the Door TrimServicing Door Trim Lifting the door off its hingesServicing Burner Assembly Regular ServiceCleaning the Glass Servicing Annual ServiceCleaning Outer Surfaces See Safety Notices ref coal setFault Diagnosis ServicingAccessories and Options Spare Parts General ComponentsAdd on Canopies Becton Bunny & Becton 7 mk3 Gas stoves Becton Bunny & Becton 7 mk3 Gas stoves Spare Parts Visual Aid Bunny Becton Part DescriptionControl Door Handle Assembly AFGS1085 AFGS080 AFGS080Becton 7 mk3 Lining Kit AFGS1072 AFGS025Guarantee Customer RegistrationService Record Date of Visit Company Work Carried Out SignatureBecton ’ve checked it and it’s O.K Final Factory Check List