Aarrow Fires Becton Bunny Service Record, Date of Visit Company Work Carried Out Signature

Page 30

SERVICE RECORD

Date of Visit

Company

Work Carried Out

Signature

Should you have any questions about your Becton Gas Stove that is not covered in this manual please con- tact your Aarrow retailer.

Please keep all repair receipts safely.

Please ensure you have this manual available when an engineer visits as they will complete the service record chart.

30

Becton Bunny & Becton 7 mk3 Gas stoves

Image 30
Contents Becton MK Flaming Good Fires Contents InstallationSafety Notices IntroductionGeneral Information Introduction Important Notices Statutory RequirementsCertification Max. Heat Setting Operating Instructions Technical DataFire Dimensions Min. Heat SettingOperating Instructions Fitting the Lining Panels Positioning the rear liningSafety Notice Please see Safety Notices ref. Coal set Operating Instructions Arranging the CoalsOperating Instructions Lighting & Controlling the Fire Operating Instructions Flue System Installation Installing the FireFitting the Feet Nacs National Association of Chimney Sweeps telephone 01785See c See dFire Location Graph 1.Combustible Shelf Clearances Installation Hearth Requirements Connecting the GAS SupplyTest Sequence Installation Fire Testing Flame failure device testingChecklist Installation Check ListServicing Detail of Pilot Assembly Ensure the appliance is cold Fire Door Glass & Seal Replacement of the Door TrimServicing Door Trim Lifting the door off its hingesServicing Burner Assembly Regular ServiceCleaning the Glass Servicing Annual ServiceCleaning Outer Surfaces See Safety Notices ref coal setFault Diagnosis ServicingAccessories and Options Spare Parts General ComponentsAdd on Canopies Becton Bunny & Becton 7 mk3 Gas stoves Becton Bunny & Becton 7 mk3 Gas stoves Spare Parts Visual Aid Bunny Becton Part DescriptionControl Door Handle Assembly AFGS1085 AFGS080 AFGS080Becton 7 mk3 Lining Kit AFGS1072 AFGS025Guarantee Customer RegistrationService Record Date of Visit Company Work Carried Out SignatureBecton ’ve checked it and it’s O.K Final Factory Check List