Regency P48-NG, P48-LP installation manual 02-88 02-83 02-86 02-85 02-89 02-84

Page 26

INSTALLATION

6) Embers should be placed in front of Log 02-85 and Log 02-86.

8)Line up the hole on the underside of Log 02-84 with the pin on Log 02-86 and position the notch on the bottom of the log into the last grate post.

02-88

02-84

02-85

02-86

 

02-86

02-83

Embers

Pin in Log

Last Grate Post

CAUTION: DO NOT cover burner ports with embers.

7)Place Log 02-83 onto the pin in Log 02-88 and position the notch on the bottom of the log into the 4th grate post.

9)Place Log 02-89 against the notch in Log 02-84. Rest the notch at the end of the log against the grate.

02-88

 

02-88

 

 

02-83

02-86

 

 

02-85

 

02-89

 

 

 

 

02-84

Rest log onto the pin

in Log 02-88.

Notch

Rest notch at the end of

 

the log against the grate.

02-8302-86

02-85

4th Grate Post

Position the notch on the bottom of

the log into the 4th grate post.

26

Regency P48 Zero Clearance Direct Vent Gas Fireplace

Image 26
Contents P48 Gas Fireplace To the New Owner Regency P48 Zero Clearance Direct Vent Gas FireplaceTable of Contents Safety Label Tiquetteé Pasne Cetteenlever Thisremove /LABELInstallation Checklist InstallationGeneral Safety Information Save These InstructionsOptional Duct System Unit Specifications Locating Your GAS StoveManufactured Mobile Home Additional Requirements Optional Heat ReleaseCeiling ClearancesMantel Max. Depth 36 914mmMantels Mantel LEG ClearancesFraming & Finishing Venting Introduction Unit Assembly Prior to InstallationTop Standoff Assembly Top Facing Support Side Nailing StripsVent Air supply outletVenting Regency Direct Vent System Flex Horizontal Terminations OnlyDescription Simpson DURA-VENT VentingSimpson DURA-VENT Venting Components List Parts not supplied by Dura-VentVenting Arrangements Horizontal Terminations Regency Direct Vent System FlexHorizontal Venting with Two 2 90o Elbows Horizontal Venting with Three 3 90o ElbowsVertical Venting with Two 2 90o Elbows Min Max Min Max Min MaxVertical Venting with Three 3 90o Elbows Option + H1 V +Venting Arrangements Vertical Terminations Simpson DURA-VENT Direct Vent GS SystemInstallation Horizontal Installations Offset Chart Vertical TerminationInstallation Procedures For Regency Direct Vent System Flex GAS Pipe Pressure Testing GAS Line Installation Pilot Adjustment High ElevationBrick Panels Installation Bottom ClipsLOG SET Installation 02-88 02-90 02-87 02-89 02-86 02-85 02-84 02-8302-88 02-83 02-86 02-85 02-89 02-84 02-87 02-88 02-8502-83 02-8902-90 02-8602-84Not under the gas line Standard Flush DoorFlush Louvers Optional Bay Trim Optional BAY DoorBAY Louvers Optional Finishing Trim Double Screen DoorOption Remote Control Thermostat Wire TableWiring Diagram Do not cut the ground terminal off under any circumstancesTo Remove the Fan Installing the Optional FANShut the power off Conversion Kit Contains Operating Instructions Normal Operating Sounds GAS Appliances Copy of the Lighting Plate InstructionsMaintenance Door Glass Installing ValveBay Glass Replacement Removing Valve Shut off the gas supplyParts List P48 Main Assembly102 100 P48 Burner & LOG Assembly P48 Flush Door & Louvers P48 BAY Front & Louvers Regency P48 Zero Clearance Direct Vent Gas Fireplace Regency P48 Zero Clearance Direct Vent Gas Fireplace Warranty ConditionsInstaller Please complete the following information