INSTALLATION
3)After five minutes, test that there is a “pull” on the fl ue by placing a smoke match, cigarette or similar device which gives off smoke, in front of the spill tube. To ensure a valid test, place a scrap piece of sheet metal (or other noncombustible material) between the spill tube and the upper louver, this will prevent the natural convection of the unit from interfering with the test. See diagram 1.
If the heater turns off because of lack of draft during the spillage test, check for the cause and if necessary, seek expert advice.
The thermally actuated safety switch will automatically reset after it has cooled off. The switch will continue to cycle until the draft problem is corrected. DO NOT BYPASS OR DISCONNECT THIS SWITCH.
LOG SET
INSTALLATION
Read the instructions below carefully and refer to the diagrams. If logs are broken do not use the unit until they are replaced. Broken logs can interfere with the pilot operation.
Diagram 1
The smoke should be drawn into the spill tube. If the smoke is still not drawn into the spill tube, turn the unit off and check for the cause of the lack of draft. If necessary, seek expert advice.
OPTIONAL
BRICK PANEL
1)Unwrap the brick pattern panels from the protective wrapping.
2)Remove the glass front if it is already in- stalled.
3)Put the rear brick panel fl at against the back of the unit.
4)Before installing the side brick panels, loosen the screws for the brick tabs enough so that you can slide the brick tabs on to the screws easily but that the tabs are secure. For the location of the side brick tab screws see diagram 1.
The gas log kit contains the following:
a) | Rear Log | ||
b) | Front Right Log | ||
c) | Middle Left Log | ||
d) | Left Top Log | ||
e) | Center Log | ||
f) | Middle Right Log | ||
g) | Front Left Log | ||
h) |
| Embers | |
i) |
| Rockwool | |
j) |
| Vermiculite |
Note: Install Optional Brick Panels prior to installing logs.
The "02" refer numbers (i.e.
molded into the rear of each log.
Diagram 1
For wind turbulent sites, a wind cap may remedy the problem.
5)Remove the brick tabs and slide the side brick panels into position. See diagram 3. Install the brick tabs. See diagram 2.
Diagram 2
1)Carefully remove the logs from the box and unwrap them. The logs are fragile, handle with care - do not force into position.
2)Sprinkle the vermiculite around the fi rebox base. Take some of the embers (approx. 1/3 of the bag) and sprinkle over the ver- miculite.
Note: The thermally activated safety switch willsensethechangeintemperatureandshut down the gas valve in the event of a severe downdraft or a blocked or disconnected vent. The switch acts as a safety
Vermiculite and | Vermiculite and | Vermiculite and | |
embers. | embers. | ||
embers. | |||
|
|
Diagram 3
10 | FPI |