Recoton/Advent U31-NG2, U31-LP2 Wiring Diagram, Make sure the glass is centered, Side Hook

Page 14

INSTALLATION

3)Open Bottom Louvers.

4)Remove the bottom glass trim. Discard both top & bottom glass trim.

5)Replace the glass and secure with the two glass clips. Do not over tighten as this could

break the glass.

Slots

Make sure the glass is centered.

Side Hook

6)Insert side hooks on the double screen door into the 4 slots between the faceplate and the glass and lower assembly into the locking position. Push down fi rmly with both hands to lock into place.

Push Screen

Door down

rmly

to lock into

place.

Insert Screen Door

hooks into the 4 slots between the faceplate and the fl ush door.

This heater does not require a 120V A.C. sup- ply for operation. In case of a power failure, the burner switch and the optional remote control/ thermostat will continue to operate. However, a 120V A.C. power supply is needed for the fan/blower operation.

WIRING DIAGRAM

Caution: Ensure that the wires do not touch any hot surfaces and are away from sharp edges.

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous opera-

WARNING: Electrical Grounding Instructions

This appliance is equipped with a three pronged (grounding) plug for your protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug.

14

FPI U31-2 Gas Fireplace Insert

Image 14
Contents U31 Gas Insert FPI GAS Fireplace Insert Table of Contents Safety Label Requirements MA Code CO DetectorInstallation Materials Required Installation ChecklistMinimum Fireplace Dimensions Clearances to CombustiblesDraft Hood Connection GAS ConnectionHigh Elevation GAS Pressure Test GAS Insert Aeration SystemVenting Test for Flue SpillageLOG SET Installation Optional Brick PanelNotch Cutout Pins on Rear Log SupportPinCutout BracketRear View Trim Assembly Diagram Faceplate & Trim InstallationFlush Front Installation Diagram Rear View Faceplate AssemblyFlush Louvers BAY Front InstallationBAY Louvers Double Door ScreenSide Hook Wiring DiagramMake sure the glass is centered Full Screen Front Bottom Frame Ensure that Top and sides are Aligned Hampton Cast Faceplate InstallationSwitch Box Assembly Boss on rear left side Piece U31 Grill Stop Bracket Hampton Cast Faceplate Grill InstallationSlide side fi ller bracket Side Hook SlotsFaceplate Trim Bracket Firebox Flange Excalibur Surround InstallationFlanges Blanking Plate Faceplate Hooks Left Side Faceplate Bracket Trim Flange Slots SurroundOperating Instructions First Fire Shutdown ProcedureCopy of Lighting Instruction Plate LOG Replacement MaintenanceMaintenance Instructions GOLD-PLATED TrimAeration Adjustment Rod Door Glass FAN Maintenance ReplacementFlush Glass Replacement Bay Glass RemovalParts List DescriptionBurner Assembly & Log Set Bay Door Flush Door400-917 Complete Custom Faceplate Set 400-939 Valve Access Faceplate402-919 Complete Faceplate Set with Black Trim Oversize 402-918 Complete Faceplate Set with Black Trim StandardParts List Hampton Cast Faceplate Assembly Warranty ConditionsInstaller Please complete the following information