Recoton/Advent U31-LP2, U31-NG2 GAS Insert Aeration System, Venting, GAS Pressure Test

Page 9

INSTALLATION

Before installing vent system ensure that the damper plate is open and secure to prevent the damper plate from falling down and crush- ing the liner.

Themanifoldpressureiscontrolledbyaregulator built into the gas control, and should be checked at the pressure test point. The pressure check shouldbecarriedoutwiththeunitburningandthe setting should be within the limits specifi ed.

GAS INSERT AERATION

SYSTEM

The aeration adjustment rod is attached to the air shutter which is located just above the orifi ce bracket. The rod is used to adjust the aeration on the main burner without having to take the appliance apart.

Diagram 1

with the screw hole in the top of the fi rebox. The screw is secured through the inside top of the fi rebox into the bottom of the spill tube. (If screw holes do not line up then draft hood is not positioned correctly.)

Diagram 2

NOTE: final gas connection should be after unit is in place to avoid damage to line when pushing the unit into position.

VENTING

THE APPLIANCE MUST NOT BE CONNECTED TOACHIMNEYFLUE SERVING A SEPARATE SOLID FUEL BURNING APPLIANCE.

This appliance is designed to attach to a 4" diam- eter type B-Vent or listed gas fuel type vent liner running the full length of the chimney.Aminimum

ue height of 12 feet is recommended. B-Vent must be supported by a vent support - supplied by vent manufacturer. See chart on this page for minimum distances from roof.

TheFPI Insert incorporates its own internal draft hood, so no additional external draft hood is required.

Periodically check that the vent is unrestricted and an adequate draft is present when the unit is in operation. (See page 8 for spillage test.)

WARNING: Operation of this ap- pliance when not connected to a properly installed and maintained venting system or tampering with the blocked vent shutoff system can result in carbon monoxide (CO) poisoning and possible death.

Combustion and Ventilation Air

WARNING: This appliance needs fresh air for safe operation and must be installed with provisions for ad- equate combustion and ventilation air available to the room in which it is to be operating.

Follow CAN/CGA B149 (in Canada) or ANSI Z223.1 (in the USA) requirements, and any local codes or regulations of the enforcing authority.

Air for combustion is drawn in through the front of the unit, therefore, the front of the unit must be kept clear of any obstructions.

GAS PRESSURE TEST

The unit is preset to give the correct gas input at the specifi ed manifold pressures shown on the label. The maximum gas manifold pressure is:

Natural Gas

3.8" w.c.

Propane

11.0" w.c.

The burner aeration is factory set but may need adjusting due to either the local gas supply, air supply or altitude.

Natural Gas:

1/8" (3.2mm) open

Propane:

3/16" (4.8mm) open

Note: Any damage due to carboning result- ing from improperly setting the aera- tion controls is NOT covered under warranty.

Note: Aeration Adjustment should only be performed by an authorized FPI Installer at the time of installation or service.

TEST FOR FLUE

SPILLAGE

A " spillage" test must be made before the installed unit is left with the customer. Follow the procedure below:

1)Start all exhaust fans in the home and then close all external doors and windows in the house.

2)Light the unit and set controls to maximum. Turn fan off.

FPI U31-2 Gas Fireplace Insert

9

Image 9
Contents U31 Gas Insert FPI GAS Fireplace Insert Table of Contents Safety Label MA Code CO Detector RequirementsInstallation Minimum Fireplace Dimensions Installation ChecklistMaterials Required Clearances to CombustiblesGAS Connection High ElevationDraft Hood Connection Venting GAS Insert Aeration SystemGAS Pressure Test Test for Flue SpillageOptional Brick Panel LOG SET InstallationPinCutout Pins on Rear Log SupportNotch Cutout BracketFlush Front Installation Faceplate & Trim InstallationRear View Trim Assembly Diagram Diagram Rear View Faceplate AssemblyBAY Louvers BAY Front InstallationFlush Louvers Double Door ScreenWiring Diagram Make sure the glass is centeredSide Hook Full Screen Front Bottom Frame Hampton Cast Faceplate Installation Switch Box Assembly Boss on rear left side PieceEnsure that Top and sides are Aligned Slide side fi ller bracket Hampton Cast Faceplate Grill InstallationU31 Grill Stop Bracket Side Hook SlotsExcalibur Surround Installation Flanges Blanking PlateFaceplate Trim Bracket Firebox Flange Hooks Left Side Faceplate Bracket Trim Flange Slots Surround FaceplateOperating Instructions Shutdown Procedure Copy of Lighting Instruction PlateFirst Fire Maintenance Instructions MaintenanceLOG Replacement GOLD-PLATED TrimFlush Glass Replacement Door Glass FAN Maintenance ReplacementAeration Adjustment Rod Bay Glass RemovalDescription Parts ListBurner Assembly & Log Set Flush Door Bay Door402-919 Complete Faceplate Set with Black Trim Oversize 400-939 Valve Access Faceplate400-917 Complete Custom Faceplate Set 402-918 Complete Faceplate Set with Black Trim StandardParts List Hampton Cast Faceplate Assembly Conditions WarrantyInstaller Please complete the following information