Recoton/Advent U31-LP2 Hampton Cast Faceplate Installation, Ensure that Top and sides are Aligned

Page 17

INSTALLATION

HAMPTON CAST

FACEPLATE INSTALLATION

NOTE: Do not install Cast Faceplate when unit is installed into a Zero Clearance Unit.

1)Lay the faceplate panels fl at, face down on something soft so they don't scratch.

2)Attach the side fi ller brackets to the left and right sides using 3 screws and washer per side.

NOTE: There are filler brackets specifically for each side. The way to differentiate this is that on the side of the brackets there are 2 mounting holes. The side where there is a 7/16" gap from the top of the bracket to the mounting hole, must face the top.

3)Attach the right and left cast sides to the top using 2 screws per side.

Ensure that the

top and sides are

aligned.

4)Use a measuring tape to ensure that the distance between the left and right side pieces is 28" (711mm).

28"

5)ConnecttheON/OFFswitchwires by taking the black and red wires with the blue female ends thru the hole provided and connecting them to the ON/OFF switch.

6)Connect the fan switch wires by taking the black and red wires with the male ends (in the grey harness) thru the hole provided and connect them with the wire connectors from the fan speed control.

7)Insert wires into the strain relief and install into switch box as- sembly.

8)Place the switch box assembly over the boss on the rear left side piece and secure with one screw.

9)Tuck the wires into the faceplate to keep them away from the insert using the clip provided. Attach the clip to the rear of the faceplate to ensure that the wires do not touch the side of the unit.

Switch Box Assembly

Boss on rear left side

piece.

10)The power cord should be run behind the faceplate panel.

FPI U31-2 Gas Fireplace Insert

17

Image 17
Contents U31 Gas Insert FPI GAS Fireplace Insert Table of Contents Safety Label MA Code CO Detector RequirementsInstallation Minimum Fireplace Dimensions Installation ChecklistMaterials Required Clearances to CombustiblesDraft Hood Connection GAS ConnectionHigh Elevation Venting GAS Insert Aeration SystemGAS Pressure Test Test for Flue SpillageOptional Brick Panel LOG SET InstallationPinCutout Pins on Rear Log SupportNotch Cutout BracketFlush Front Installation Faceplate & Trim InstallationRear View Trim Assembly Diagram Diagram Rear View Faceplate AssemblyBAY Louvers BAY Front InstallationFlush Louvers Double Door ScreenSide Hook Wiring DiagramMake sure the glass is centered Full Screen Front Bottom Frame Ensure that Top and sides are Aligned Hampton Cast Faceplate InstallationSwitch Box Assembly Boss on rear left side Piece Slide side fi ller bracket Hampton Cast Faceplate Grill InstallationU31 Grill Stop Bracket Side Hook SlotsFaceplate Trim Bracket Firebox Flange Excalibur Surround InstallationFlanges Blanking Plate Hooks Left Side Faceplate Bracket Trim Flange Slots Surround FaceplateOperating Instructions First Fire Shutdown ProcedureCopy of Lighting Instruction Plate Maintenance Instructions MaintenanceLOG Replacement GOLD-PLATED TrimFlush Glass Replacement Door Glass FAN Maintenance ReplacementAeration Adjustment Rod Bay Glass RemovalDescription Parts ListBurner Assembly & Log Set Flush Door Bay Door402-919 Complete Faceplate Set with Black Trim Oversize 400-939 Valve Access Faceplate400-917 Complete Custom Faceplate Set 402-918 Complete Faceplate Set with Black Trim StandardParts List Hampton Cast Faceplate Assembly Conditions WarrantyInstaller Please complete the following information