Lochinvar 45000, 260000 service manual

Page 52

Revision A (ECO #C03746) initial release.

Revision B (ECO #C06868) update the pressure drop chart (Table 4C) to reflect the correct models and change out the reference to the two blues wires to SYS/TANK contacts under System Sensor on page 36 (ECR03727).

SBR-I-S Rev B 11/10

Image 52
Contents Models 45,000 260,000 Btu/hr Contents Warranty Please read before proceedingCodes Solution Boiler =B=R Rating RatingsSolution How it works Temperature and pressure gaugeSolution How it works Solution How it works Determine boiler location Location of unit3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Conventional Negative Draft Venting System VentingVent Pipe Sizes Venting Vertical Vent Termination Clearances Less from Ridge From Parapet WallMasonry Chimney Installation Sidewall Venting Negative DraftVent Materials Fan Assisted VentingAutomatic Vent Damper 7Vent Damper and Vent Damper Terminal BlockGas Supply Gas Pressure Test Gas connectionsGas Connection Install Piping to Control Gas PipingGas Manifold Pressure Adjustment Procedure 2WrenchChecking Gas Supply Pressure 4Gas Supply PressureVenting of Combination Gas Valves Combination Gas ValvesTwo Stage Burner Control System Water connections Water Flow Switch if equippedRelief Valve Typical Heating Boiler Installations Low Water Cutoff if equippedMinimum Required Flow For Heating Boiler General Plumbing RulesSystem Temperature Rise Chart Piping of the Boiler SystemWater Connections Heat Exchanger Pressure Drop ChartCirculator Pump Requirements Primary/Secondary Boiler Piping Circulator Pump SpecificationsCirculator Pump Operation Full Flow Application Low Temperature Bypass RequirementsBoiler Flow Rates Primary / Secondary Piping Make UP WaterMake UP Water 6Multiple Boilers Zoned with Circulators Full System Flow From System8Single Boiler Full System Flow with Low Temperature Bypass Terminal Strip Wiring Boiler Operating Temperature ControlElectrical connections Auxiliary Device Connection to Terminal StripTemperature Adjustment AMP Draw DataMaximum SET Point Determination Maximum Set Point DeterminationWiring of Remote Sensors Outdoor Air Temperature SensorInstallation of Remote Sensors Outdoor Air Reset Option Additional Temperature ControlsBlocked Vent and Flame Roll-Out / Flame Interlock Switch 7Blocked Vent Switch LocationPre-start Checklist Start-upInitial Start-up Lighting Instructions for Spark Ignition Pilot ModelsOperating Instructions Safety Shutoff Test for Spark Ignition Pilot SystemTo Turn Off Gas to Appliance Intermittent Pilot Spark Ignition System Freeze ProtectionWater Treatment Ignition and Control TimingsMaintenance Maintenance and annual startup Service technicianOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Expansion Tank Check Relief ValveCheck All Wiring Check Control SettingsHeat Exchanger / Burner Access Perform Start-up and ChecksInspection and Cleaning Breathing Fresh airReview with owner Inspection of Heat Exchanger WaterwaysGas Train and Controls Water Circulating PumpTroubleshooting Troubleshooting Guide M9 Solution BoilersDiagrams Schematic Diagram M9 UnitWiring Diagram M9 Unit 45,000 260,000 Btu/hr Models 45,000 260,000 Btu/hr Models