Lochinvar 45000, 260000 service manual Make UP Water

Page 30

Installation & Service Manual

4Water connections

Primary / Secondary Piping

Figure 4-5_Single Boiler - Primary / Secondary with Low Temperature Bypass

BACKFLOW PREVENTER

PRESSURE

REDUCING VALVE

PRESSURE

GAUGE

MAKE UP WATER

 

SYSTEM SUPPLY

AIR

SENSOR

SEPARATOR

SYSTEM

 

CIRCULATOR

FROM

TO

SYSTEM

SYSTEM

NOT TO EXCEED 12"APART

 

BALL VALVE

LOW TEMPERATURE BYPASS

(TYPICAL)

 

EXPANSION

BOILER

CIRCULATOR

TANK

 

DRAIN POINT

(TYPICAL)

Y-STRAINER

(RECOMMENDED)

UNION (TYPICAL)

TEMPERATURE / PRESSURE

GAUGE DRAIN

PRESSURE

RELIEF VALVE

SOLUTION

BOILER

30

Image 30
Contents Models 45,000 260,000 Btu/hr Contents Warranty Please read before proceedingCodes Solution Boiler =B=R Rating RatingsSolution How it works Temperature and pressure gaugeSolution How it works Solution How it works Determine boiler location Location of unit3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Venting Conventional Negative Draft Venting SystemVent Pipe Sizes Venting Vertical Vent Termination Clearances Less from Ridge From Parapet WallVent Materials Masonry Chimney InstallationSidewall Venting Negative Draft Fan Assisted VentingAutomatic Vent Damper 7Vent Damper and Vent Damper Terminal BlockGas connections Gas Supply Gas Pressure TestGas Connection Install Piping to Control Gas PipingGas Manifold Pressure Adjustment Procedure 2WrenchChecking Gas Supply Pressure 4Gas Supply PressureCombination Gas Valves Venting of Combination Gas ValvesTwo Stage Burner Control System Water Flow Switch if equipped Water connectionsRelief Valve Minimum Required Flow For Heating Boiler Typical Heating Boiler InstallationsLow Water Cutoff if equipped General Plumbing RulesSystem Temperature Rise Chart Piping of the Boiler SystemHeat Exchanger Pressure Drop Chart Water ConnectionsCirculator Pump Requirements Circulator Pump Specifications Primary/Secondary Boiler PipingCirculator Pump Operation Low Temperature Bypass Requirements Full Flow ApplicationBoiler Flow Rates Primary / Secondary Piping Make UP WaterMake UP Water 6Multiple Boilers Zoned with Circulators Full System Flow From System8Single Boiler Full System Flow with Low Temperature Bypass Electrical connections Terminal Strip WiringBoiler Operating Temperature Control Auxiliary Device Connection to Terminal StripTemperature Adjustment AMP Draw DataMaximum SET Point Determination Maximum Set Point DeterminationOutdoor Air Temperature Sensor Wiring of Remote SensorsInstallation of Remote Sensors Outdoor Air Reset Option Additional Temperature ControlsBlocked Vent and Flame Roll-Out / Flame Interlock Switch 7Blocked Vent Switch LocationInitial Start-up Pre-start ChecklistStart-up Lighting Instructions for Spark Ignition Pilot ModelsSafety Shutoff Test for Spark Ignition Pilot System Operating InstructionsTo Turn Off Gas to Appliance Water Treatment Intermittent Pilot Spark Ignition SystemFreeze Protection Ignition and Control TimingsOwner maintenance Maintenance Maintenance and annual startupService technician See the User’s Information Manual for instructionsMaintenance Check Expansion Tank Check Relief ValveHeat Exchanger / Burner Access Check All WiringCheck Control Settings Perform Start-up and ChecksInspection and Cleaning Breathing Fresh airGas Train and Controls Review with ownerInspection of Heat Exchanger Waterways Water Circulating PumpTroubleshooting Troubleshooting Guide M9 Solution BoilersWiring Diagram M9 Unit 45,000 260,000 Btu/hr Models DiagramsSchematic Diagram M9 Unit 45,000 260,000 Btu/hr Models