Lochinvar 45000, 260000 Diagrams, Schematic Diagram M9 Unit, 45,000 260,000 Btu/hr Models

Page 50

9 Diagrams

Schematic Diagram - M9 Unit

45,000 - 260,000 Btu/hr Models

50

Installation & Service Manual

Wiring Diagram - M9

Unit

45,000 - 260,000 Btu/hr

Models

Image 50
Contents Models 45,000 260,000 Btu/hr Contents Warranty Please read before proceedingCodes Solution Boiler =B=R Rating RatingsSolution How it works Temperature and pressure gaugeSolution How it works Solution How it works Determine boiler location Location of unit3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Vent Pipe Sizes VentingConventional Negative Draft Venting System Venting Vertical Vent Termination Clearances Less from Ridge From Parapet WallVent Materials Masonry Chimney InstallationSidewall Venting Negative Draft Fan Assisted VentingAutomatic Vent Damper 7Vent Damper and Vent Damper Terminal BlockGas Connection Gas connectionsGas Supply Gas Pressure Test Install Piping to Control Gas PipingGas Manifold Pressure Adjustment Procedure 2WrenchChecking Gas Supply Pressure 4Gas Supply PressureTwo Stage Burner Control System Combination Gas ValvesVenting of Combination Gas Valves Relief Valve Water Flow Switch if equippedWater connections Minimum Required Flow For Heating Boiler Typical Heating Boiler InstallationsLow Water Cutoff if equipped General Plumbing RulesSystem Temperature Rise Chart Piping of the Boiler SystemCirculator Pump Requirements Heat Exchanger Pressure Drop ChartWater Connections Circulator Pump Operation Circulator Pump SpecificationsPrimary/Secondary Boiler Piping Boiler Flow Rates Low Temperature Bypass RequirementsFull Flow Application Primary / Secondary Piping Make UP WaterMake UP Water 6Multiple Boilers Zoned with Circulators Full System Flow From System8Single Boiler Full System Flow with Low Temperature Bypass Electrical connections Terminal Strip WiringBoiler Operating Temperature Control Auxiliary Device Connection to Terminal StripTemperature Adjustment AMP Draw DataMaximum SET Point Determination Maximum Set Point DeterminationInstallation of Remote Sensors Outdoor Air Temperature SensorWiring of Remote Sensors Outdoor Air Reset Option Additional Temperature ControlsBlocked Vent and Flame Roll-Out / Flame Interlock Switch 7Blocked Vent Switch LocationInitial Start-up Pre-start ChecklistStart-up Lighting Instructions for Spark Ignition Pilot ModelsTo Turn Off Gas to Appliance Safety Shutoff Test for Spark Ignition Pilot SystemOperating Instructions Water Treatment Intermittent Pilot Spark Ignition SystemFreeze Protection Ignition and Control TimingsOwner maintenance Maintenance Maintenance and annual startupService technician See the User’s Information Manual for instructionsMaintenance Check Expansion Tank Check Relief ValveHeat Exchanger / Burner Access Check All WiringCheck Control Settings Perform Start-up and ChecksInspection and Cleaning Breathing Fresh airGas Train and Controls Review with ownerInspection of Heat Exchanger Waterways Water Circulating PumpTroubleshooting Troubleshooting Guide M9 Solution BoilersWiring Diagram M9 Unit 45,000 260,000 Btu/hr Models DiagramsSchematic Diagram M9 Unit 45,000 260,000 Btu/hr Models