Lochinvar 260000, 45000 service manual 8Single Boiler Full System Flow with Low Temperature Bypass

Page 33

Installation & Service Manual

4Water connections (continued)

Full System Flow

Figure 4-8_Single Boiler Full System Flow with Low Temperature Bypass

BACKFLOW PREVENTER

PRESSURE

REDUCING VALVE

PRESSURE

GAUGE

MAKE UP WATER

 

SYSTEM SUPPLY

AIR

SENSOR

SEPARATOR

SYSTEM

 

CIRCULATOR

FROM

 

TO

SYSTEM

SYSTEM

 

BALL VALVE

 

(TYPICAL)

3-WAY VALVE W/BYPASS PIPE

 

EXPANSION

 

TANK

 

 

BOILER

 

CIRCULATOR

Y-STRAINER

(RECOMMENDED)

UNION (TYPICAL)

TEMPERATURE / PRESSURE

GAUGEDRAIN

PRESSURE

RELIEF VALVE

SOLUTION

BOILER

33

Image 33
Contents Models 45,000 260,000 Btu/hr Contents Please read before proceeding WarrantyCodes Ratings Solution Boiler =B=R RatingTemperature and pressure gauge Solution How it worksSolution How it works Solution How it works Location of unit Determine boiler location3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Venting Conventional Negative Draft Venting SystemVent Pipe Sizes Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesSidewall Venting Negative Draft Masonry Chimney InstallationVent Materials Fan Assisted Venting7Vent Damper and Vent Damper Terminal Block Automatic Vent DamperGas connections Gas Supply Gas Pressure TestGas Connection Gas Piping Install Piping to Control2Wrench Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureCombination Gas Valves Venting of Combination Gas ValvesTwo Stage Burner Control System Water Flow Switch if equipped Water connectionsRelief Valve Low Water Cutoff if equipped Typical Heating Boiler InstallationsMinimum Required Flow For Heating Boiler General Plumbing RulesPiping of the Boiler System System Temperature Rise ChartHeat Exchanger Pressure Drop Chart Water ConnectionsCirculator Pump Requirements Circulator Pump Specifications Primary/Secondary Boiler PipingCirculator Pump Operation Low Temperature Bypass Requirements Full Flow ApplicationBoiler Flow Rates Make UP Water Primary / Secondary PipingMake UP Water 6Multiple Boilers Zoned with Circulators From System Full System Flow8Single Boiler Full System Flow with Low Temperature Bypass Boiler Operating Temperature Control Terminal Strip WiringElectrical connections Auxiliary Device Connection to Terminal StripAMP Draw Data Temperature AdjustmentMaximum Set Point Determination Maximum SET Point DeterminationOutdoor Air Temperature Sensor Wiring of Remote SensorsInstallation of Remote Sensors Additional Temperature Controls Outdoor Air Reset Option7Blocked Vent Switch Location Blocked Vent and Flame Roll-Out / Flame Interlock SwitchStart-up Pre-start ChecklistInitial Start-up Lighting Instructions for Spark Ignition Pilot ModelsSafety Shutoff Test for Spark Ignition Pilot System Operating InstructionsTo Turn Off Gas to Appliance Freeze Protection Intermittent Pilot Spark Ignition SystemWater Treatment Ignition and Control TimingsService technician Maintenance Maintenance and annual startupOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Relief Valve Check Expansion TankCheck Control Settings Check All WiringHeat Exchanger / Burner Access Perform Start-up and ChecksBreathing Fresh air Inspection and CleaningInspection of Heat Exchanger Waterways Review with ownerGas Train and Controls Water Circulating PumpTroubleshooting Guide M9 Solution Boilers TroubleshootingSchematic Diagram M9 Unit DiagramsWiring Diagram M9 Unit 45,000 260,000 Btu/hr Models 45,000 260,000 Btu/hr Models