Lochinvar 260000, 45000 service manual Models 45,000 260,000 Btu/hr

Page 1

SBR-I-S Rev B

Installation & Service Manual

Models: 45,000 - 260,000 Btu/hr

WARNING:

This manual supplies information for the installation, operation, and servicing of the appliance. It is strongly recommended that this manual be reviewed completely before proceeding with an installation. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.

Save this manual for future reference.

Image 1
Contents Models 45,000 260,000 Btu/hr Contents Please read before proceeding WarrantyCodes Ratings Solution Boiler =B=R RatingTemperature and pressure gauge Solution How it worksSolution How it works Solution How it works Location of unit Determine boiler location3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Conventional Negative Draft Venting System VentingVent Pipe Sizes Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesSidewall Venting Negative Draft Masonry Chimney InstallationVent Materials Fan Assisted Venting7Vent Damper and Vent Damper Terminal Block Automatic Vent DamperGas Supply Gas Pressure Test Gas connectionsGas Connection Gas Piping Install Piping to Control2Wrench Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureVenting of Combination Gas Valves Combination Gas ValvesTwo Stage Burner Control System Water connections Water Flow Switch if equippedRelief Valve Low Water Cutoff if equipped Typical Heating Boiler InstallationsMinimum Required Flow For Heating Boiler General Plumbing RulesPiping of the Boiler System System Temperature Rise ChartWater Connections Heat Exchanger Pressure Drop ChartCirculator Pump Requirements Primary/Secondary Boiler Piping Circulator Pump SpecificationsCirculator Pump Operation Full Flow Application Low Temperature Bypass RequirementsBoiler Flow Rates Make UP Water Primary / Secondary PipingMake UP Water 6Multiple Boilers Zoned with Circulators From System Full System Flow8Single Boiler Full System Flow with Low Temperature Bypass Boiler Operating Temperature Control Terminal Strip WiringElectrical connections Auxiliary Device Connection to Terminal StripAMP Draw Data Temperature AdjustmentMaximum Set Point Determination Maximum SET Point DeterminationWiring of Remote Sensors Outdoor Air Temperature SensorInstallation of Remote Sensors Additional Temperature Controls Outdoor Air Reset Option7Blocked Vent Switch Location Blocked Vent and Flame Roll-Out / Flame Interlock SwitchStart-up Pre-start ChecklistInitial Start-up Lighting Instructions for Spark Ignition Pilot ModelsOperating Instructions Safety Shutoff Test for Spark Ignition Pilot SystemTo Turn Off Gas to Appliance Freeze Protection Intermittent Pilot Spark Ignition SystemWater Treatment Ignition and Control TimingsService technician Maintenance Maintenance and annual startupOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Relief Valve Check Expansion TankCheck Control Settings Check All WiringHeat Exchanger / Burner Access Perform Start-up and ChecksBreathing Fresh air Inspection and CleaningInspection of Heat Exchanger Waterways Review with ownerGas Train and Controls Water Circulating PumpTroubleshooting Guide M9 Solution Boilers TroubleshootingSchematic Diagram M9 Unit DiagramsWiring Diagram M9 Unit 45,000 260,000 Btu/hr Models 45,000 260,000 Btu/hr Models