Lochinvar 260000, 45000 service manual Ratings, Solution Boiler =B=R Rating

Page 5

Installation & Service Manual

Ratings

Solution Boiler

I=B=R Rating

 

 

 

 

 

Net

Model Number

Input

 

Gross

I=B=R

 

Ratings

 

MBH

 

Output

Note: Change “N” to

 

 

 

MBH

Water,

 

 

 

 

MBH

“L” for L.P. gas models.

(Note 4)

 

 

 

 

 

 

 

 

 

 

 

(Note 1,5)

(Note 1,5)

 

Min

 

Max

 

 

 

 

CBN045

23

 

45

37

32

 

 

 

 

 

 

CBN075

38

 

75

62

54

 

 

 

 

 

 

CBN090

45

 

90

75

65

 

 

 

 

 

 

CBN135

68

 

135

112

97

 

 

 

 

 

 

CBN180

90

 

180

149

130

 

 

 

 

 

 

CBN215

108

 

215

178

155

 

 

 

 

 

 

CBN260

130

 

260

216

188

 

 

 

 

 

 

Other Specifications

Boiler Water

Water

Gas

Vent

 

Content

 

Connections

Connections

Size

Gallons

 

 

 

 

 

 

(Note 3)

 

 

 

 

0.87

1 1/2"

1/2"

4"

 

 

 

 

0.91

1 1/2"

1/2"

5"

 

 

 

 

0.91

1 1/2"

1/2"

5"

 

 

 

 

0.95

1 1/2"

1/2"

6"

 

 

 

 

0.99

1 1/2"

3/4"

7"

 

 

 

 

1.02

1 1/2"

3/4"

7"

 

 

 

 

1.06

2"

3/4"

8"

 

 

 

 

NOTICE Maximum allowed working pressure is located on the rating plate.

Notes:

1.The ratings are based on standard test procedures prescribed by the United States Department of Energy.

2. Net I=B=R ratings are based on net installed radiation of sufficient quantity for the requirements of the building and nothing need be added for normal piping and pickup. Ratings are based on a piping and pickup allowance of 1.15.

3. Use only the vent materials and methods specified in the Installation and Service Manual.

4. The Solution is orificed for operation up to 2000 feet altitude. The appliance will be derated 4% per 1000 feet above 2000 feet elevation. Consult the factory for installations above 2000 feet elevation.

5.Ratings have been confirmed by the Hydronics Institute, Section of AHRI.

Figure A High Altitude Label Location

UNIT EQUIPPED FOR

HIGH ALTITUDE

UP TO 2000 FT.

5

Image 5
Contents Models 45,000 260,000 Btu/hr Contents Please read before proceeding WarrantyCodes Ratings Solution Boiler =B=R RatingTemperature and pressure gauge Solution How it worksSolution How it works Solution How it works Location of unit Determine boiler location3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Vent Pipe Sizes VentingConventional Negative Draft Venting System Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesSidewall Venting Negative Draft Masonry Chimney InstallationVent Materials Fan Assisted Venting7Vent Damper and Vent Damper Terminal Block Automatic Vent DamperGas Connection Gas connectionsGas Supply Gas Pressure Test Gas Piping Install Piping to Control2Wrench Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureTwo Stage Burner Control System Combination Gas ValvesVenting of Combination Gas Valves Relief Valve Water Flow Switch if equippedWater connections Low Water Cutoff if equipped Typical Heating Boiler InstallationsMinimum Required Flow For Heating Boiler General Plumbing RulesPiping of the Boiler System System Temperature Rise ChartCirculator Pump Requirements Heat Exchanger Pressure Drop ChartWater Connections Circulator Pump Operation Circulator Pump SpecificationsPrimary/Secondary Boiler Piping Boiler Flow Rates Low Temperature Bypass RequirementsFull Flow Application Make UP Water Primary / Secondary PipingMake UP Water 6Multiple Boilers Zoned with Circulators From System Full System Flow8Single Boiler Full System Flow with Low Temperature Bypass Boiler Operating Temperature Control Terminal Strip WiringElectrical connections Auxiliary Device Connection to Terminal StripAMP Draw Data Temperature AdjustmentMaximum Set Point Determination Maximum SET Point DeterminationInstallation of Remote Sensors Outdoor Air Temperature SensorWiring of Remote Sensors Additional Temperature Controls Outdoor Air Reset Option7Blocked Vent Switch Location Blocked Vent and Flame Roll-Out / Flame Interlock SwitchStart-up Pre-start ChecklistInitial Start-up Lighting Instructions for Spark Ignition Pilot ModelsTo Turn Off Gas to Appliance Safety Shutoff Test for Spark Ignition Pilot SystemOperating Instructions Freeze Protection Intermittent Pilot Spark Ignition SystemWater Treatment Ignition and Control TimingsService technician Maintenance Maintenance and annual startupOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Relief Valve Check Expansion TankCheck Control Settings Check All WiringHeat Exchanger / Burner Access Perform Start-up and ChecksBreathing Fresh air Inspection and CleaningInspection of Heat Exchanger Waterways Review with ownerGas Train and Controls Water Circulating PumpTroubleshooting Guide M9 Solution Boilers TroubleshootingSchematic Diagram M9 Unit DiagramsWiring Diagram M9 Unit 45,000 260,000 Btu/hr Models 45,000 260,000 Btu/hr Models