4Water connections (continued)
9.Inspect the liquid level in the expansion tank. The system must be full and under normal operating pressure to ensure proper water level in the expansion tank. Ensure that diaphragm type expansion tanks are properly charged and not water logged.
10.Start the boiler according to the Section 6 -
11.Recheck the water level in the expansion tank. If it exceeds half the tank volume, open the tank to reduce the water level. Recheck pressure charge on diaphragm type tanks.
12.Shut down the entire system and vent all radiation units and high points in the system.
13.Close the water makeup valve and check the strainer and pressure reducing valve for sediment or debris. Reopen the water makeup valve.
14.Verify system pressure with the boiler pressure gauge before beginning regular operation.
15.Within three days of
Piping of the Boiler System
The drawings in this section (see FIG’s
CAUTION | This boiler system should not be operated at |
less than 12 PSIG. |
TABLE - 4B
SYSTEM TEMPERATURE RISE CHART
Based on Boiler Output in Btu/hr
| Btu/hr |
| 10°F T | 20°F T | 30°F T | 40°F T |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| Input |
| Output | GPM | Ft/hd | GPM | Ft/hd | GPM | Ft/hd | GPM | Ft/hd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 45,000 |
| 36,900 | 7.4 | 0.6 | 3.7 | 0.2 | 2.5 | 0.2 | 1.9 | 0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 75,000 |
| 61,500 | 12.3 | 1.3 | 6.2 | 0.4 | 4.1 | 0.3 | 3.1 | 0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 90,000 |
| 73,800 | 14.9 | 1.4 | 7.4 | 0.5 | 5.0 | 0.3 | 3.7 | 0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 135,000 |
| 110,700 | 22.3 | 3.2 | 11.1 | 1.2 | 7.4 | 0.6 | 5.6 | 0.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 180,000 |
| 147,600 | 29.7 | 5.1 | 14.9 | 1.6 | 9.9 | 0.7 | 7.4 | 0.4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 215,000 |
| 176,300 | 17.0 | 1.3 | 11.8 | 0.8 | 8.9 | 0.4 |
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
| 260,000 |
| 213,200 | 21.5 | 2.1 | 14.3 | 0.9 | 10.7 | 0.5 |
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|