4Water connections (continued)

PUMP INSTALLATION AND MAINTENANCE: The boiler circulating pump must be purchased locally. For installation and maintenance information on the circulator pump, refer to the pump manufacturers instruction package included with the pump.

Circulator Pump Specifications

1.Maximum operating pressure for the pump must exceed system operating pressure.

2.Maximum water temperature should not exceed nameplate rating.

3.Cast iron circulators may be used for closed loop systems.

4.A properly sized expansion tank must be installed near the boiler and located on the suction side of the pump.

Circulator Pump Operation

Boilers are equipped with a relay for controlling the circulation pump for the hot water loop. The relay turns ON and OFF in response to the “W” input from the wall thermostat or zone control.

The field installed boiler pump MUST NOT exceed 1 h.p. For continuous pump operation, wire the system pump to the 120V supply. The pump should be connected at the

PERFORMANCE LOOP

These units are equipped with an integral performance loop, which is designed to provide efficiency optimization by maintaining a constant flow through the unit’s heat exchanger loop when building system flow is reduced. The performance loop assembly is standard equipment and is NOT to be used as a system or boiler pump.

NOTICE

The performance loop is dedicated to

the unit and does not affect the

 

 

 

building’s system or primary/secondary

 

flow characteristics and will not

 

circulate the building.

It is acceptable to remove the performance loop as long as the following requirements are met:

1.The boiler is piped to the system in primary/secondary fashion.

2.The system setpoint is 140°F or higher.

3.The boiler circulating pump is sized for the appropriate flow through the boiler.

4.The system sensor is installed in an acceptable location for sensing the system supply temperature.

5.If water temperature is below 140°F a low temperature bypass must be installed, (VAL30000 - 1 1/2" LTV Valve Kit) and follow the piping diagram in FIG. 4-4.

junction box as shown in FIG. 4-3.

120V

SUPPLY

NOTICE

WARNING

If removal of the performance loop is necessary, consult the manufacturer for a Solution Without a Performance Loop (KIT30068).

Failure to install the system sensor can cause operation problems such as nuisance high limit trips.

TO

UNIT

TO

CIRCULATION

PUMP

TO PERFORMANCE

LOOP PUMP (OPT.)

Figure 4-3_Boiler Wiring - Circulation Pump to Junction Box

Primary/Secondary Boiler Piping

A primary/secondary piping system may also be installed to ensure proper boiler flow rates. Primary/secondary piping is also ideal for systems using a mixture of propylene glycol and water. A primary/secondary piping system uses a dedicated pump to supply flow to the boiler only. This pump is sized based on desired boiler flow rate, boiler head loss and head loss in the secondary system piping only. The secondary pump, in- stalled in the boiler piping, ensures a constant water flow rate to the boiler for proper operation. Boiler installation with a primary/secondary piping system can prevent noise problems caused by low system water flows. A primary/secondary piping system is recommended on any boiler where low water flow conditions may present an operational problem.

27

Image 27
Contents Models 45,000 260,000 Btu/hr Contents Please read before proceeding WarrantyCodes Ratings Solution Boiler =B=R RatingTemperature and pressure gauge Solution How it worksSolution How it works Solution How it works Location of unit Determine boiler location3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Venting Conventional Negative Draft Venting SystemVent Pipe Sizes Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesFan Assisted Venting Masonry Chimney InstallationSidewall Venting Negative Draft Vent Materials7Vent Damper and Vent Damper Terminal Block Automatic Vent DamperGas connections Gas Supply Gas Pressure TestGas Connection Gas Piping Install Piping to Control2Wrench Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureCombination Gas Valves Venting of Combination Gas ValvesTwo Stage Burner Control System Water Flow Switch if equipped Water connectionsRelief Valve General Plumbing Rules Typical Heating Boiler InstallationsLow Water Cutoff if equipped Minimum Required Flow For Heating BoilerPiping of the Boiler System System Temperature Rise ChartHeat Exchanger Pressure Drop Chart Water ConnectionsCirculator Pump Requirements Circulator Pump Specifications Primary/Secondary Boiler PipingCirculator Pump Operation Low Temperature Bypass Requirements Full Flow ApplicationBoiler Flow Rates Make UP Water Primary / Secondary PipingMake UP Water 6Multiple Boilers Zoned with Circulators From System Full System Flow8Single Boiler Full System Flow with Low Temperature Bypass Auxiliary Device Connection to Terminal Strip Terminal Strip WiringBoiler Operating Temperature Control Electrical connectionsAMP Draw Data Temperature AdjustmentMaximum Set Point Determination Maximum SET Point DeterminationOutdoor Air Temperature Sensor Wiring of Remote SensorsInstallation of Remote Sensors Additional Temperature Controls Outdoor Air Reset Option7Blocked Vent Switch Location Blocked Vent and Flame Roll-Out / Flame Interlock SwitchLighting Instructions for Spark Ignition Pilot Models Pre-start ChecklistStart-up Initial Start-upSafety Shutoff Test for Spark Ignition Pilot System Operating InstructionsTo Turn Off Gas to Appliance Ignition and Control Timings Intermittent Pilot Spark Ignition SystemFreeze Protection Water TreatmentSee the User’s Information Manual for instructions Maintenance Maintenance and annual startupService technician Owner maintenanceMaintenance Check Relief Valve Check Expansion TankPerform Start-up and Checks Check All WiringCheck Control Settings Heat Exchanger / Burner AccessBreathing Fresh air Inspection and CleaningWater Circulating Pump Review with ownerInspection of Heat Exchanger Waterways Gas Train and ControlsTroubleshooting Guide M9 Solution Boilers Troubleshooting45,000 260,000 Btu/hr Models DiagramsSchematic Diagram M9 Unit Wiring Diagram M9 Unit 45,000 260,000 Btu/hr Models