Lochinvar 45000, 260000 service manual Solution How it works

Page 8

Installation & Service Manual

The Solution - How it works...

10

17

15

8

3

5

1

19

4

20

Models 135,000 - 260,000 Btu/hr Front View

Models 135,000 - 260,000 Btu/hr Rear View

11

9

21

7

18

12

3

6

3

23

14

22

25

24

Models 135,000 - 260,000 Btu/hr Right Side (inside unit)

Models 135,000 - 260,000 Btu/hr Left Side (inside unit)

8

Image 8
Contents Models 45,000 260,000 Btu/hr Contents Warranty Please read before proceedingCodes Solution Boiler =B=R Rating RatingsSolution How it works Temperature and pressure gaugeSolution How it works Solution How it works Determine boiler location Location of unit3Combustion Air Direct from Outside 6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Vent Pipe Sizes VentingConventional Negative Draft Venting System Venting Vertical Vent Termination Clearances Less from Ridge From Parapet WallMasonry Chimney Installation Sidewall Venting Negative DraftVent Materials Fan Assisted VentingAutomatic Vent Damper 7Vent Damper and Vent Damper Terminal BlockGas Connection Gas connectionsGas Supply Gas Pressure Test Install Piping to Control Gas PipingGas Manifold Pressure Adjustment Procedure 2WrenchChecking Gas Supply Pressure 4Gas Supply PressureTwo Stage Burner Control System Combination Gas ValvesVenting of Combination Gas Valves Relief Valve Water Flow Switch if equippedWater connections Typical Heating Boiler Installations Low Water Cutoff if equippedMinimum Required Flow For Heating Boiler General Plumbing RulesSystem Temperature Rise Chart Piping of the Boiler SystemCirculator Pump Requirements Heat Exchanger Pressure Drop ChartWater Connections Circulator Pump Operation Circulator Pump SpecificationsPrimary/Secondary Boiler Piping Boiler Flow Rates Low Temperature Bypass RequirementsFull Flow Application Primary / Secondary Piping Make UP WaterMake UP Water 6Multiple Boilers Zoned with Circulators Full System Flow From System8Single Boiler Full System Flow with Low Temperature Bypass Terminal Strip Wiring Boiler Operating Temperature ControlElectrical connections Auxiliary Device Connection to Terminal StripTemperature Adjustment AMP Draw DataMaximum SET Point Determination Maximum Set Point DeterminationInstallation of Remote Sensors Outdoor Air Temperature SensorWiring of Remote Sensors Outdoor Air Reset Option Additional Temperature ControlsBlocked Vent and Flame Roll-Out / Flame Interlock Switch 7Blocked Vent Switch LocationPre-start Checklist Start-upInitial Start-up Lighting Instructions for Spark Ignition Pilot ModelsTo Turn Off Gas to Appliance Safety Shutoff Test for Spark Ignition Pilot SystemOperating Instructions Intermittent Pilot Spark Ignition System Freeze ProtectionWater Treatment Ignition and Control TimingsMaintenance Maintenance and annual startup Service technicianOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Expansion Tank Check Relief ValveCheck All Wiring Check Control SettingsHeat Exchanger / Burner Access Perform Start-up and ChecksInspection and Cleaning Breathing Fresh airReview with owner Inspection of Heat Exchanger WaterwaysGas Train and Controls Water Circulating PumpTroubleshooting Troubleshooting Guide M9 Solution BoilersDiagrams Schematic Diagram M9 UnitWiring Diagram M9 Unit 45,000 260,000 Btu/hr Models 45,000 260,000 Btu/hr Models