Century Jefferson manual Location of Vent Termination

Page 10

Jefferson Direct Vent/Natural Vent Gas Heater

Vent Termination Clearances

Your stove is approved to be vented either through the side wall, or vertical through the roof.

CFM Corporation does not require any opening for inspection of vent pipe.

Only CFM Corporation and Simpson DuraVent venting components specifically approved and labelled for this stove may be used.

Minimum clearances between vent pipes and combustible materials is one (1”) inch (25 mm), except where stated otherwise.

Venting terminals shall not be recessed into a wall or siding.

Horizontal venting must be installed on a level plane without an inclining or declining slope.

There must not be any obstruction such as bushes, garden sheds, fences, decks or utility buildings within 24” from the front of the termination hood.

Do not locate termination hood where excessive snow or ice build up may occur. Be sure to check vent termi- nation area after snow falls, and clear to prevent ac- cidental blockage of venting system. When using snow blowers, make sure snow is not directed towards vent termination area.

Location of Vent Termination

It is imperative the vent termination be located observ- ing the minimum clearances as shown in Figure 9.

1010

30004177

Image 10
Contents Jefferson Direct Vent/Natural Vent Gas Heater Table of Contents Installation & Operating Instructions Requirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedJefferson Direct Vent/Natural Vent Stove Dimensions Jefferson dimensionsLocating The Stove Installation RequirementsClearance Requirements Wall and Ceiling Clearances Wall Centerline from Floor Hearth Requirements High Elevations Gas SpecificationsGas Inlet and Manifold Pressures Horizontal Termination Direct Vent onlyVertical Termination Direct Vent only Restictor Plate is used on Direct Vent installations onlyVent Termination Clearances Location of Vent Termination Canadian Installations1 US Installations2 General Venting Information Termination LocationVenting Requirements Natural Vent Only Termination ClearancesVenting Requirements and Options Direct Vent only Approved Vent System ComponentsTools Required Assembly ProceduresInstall the Optional Fan Unpack the StoveInstall the Vent Adapter Pipe Venting System Assembly Direct Vent General InformationFor Canadian installations The venting system must Attach the Inner Vent Assembly to the stove Attach inner assembly to flue collarSide Wall Termination Assembly Simpson Dura-Vent install outer adapter pipeVent Termination Below Grade Measure the horizontal lengthVertical Through the Roof Vent Assembly Venting System Assembly Natural Vent General InformationInstall the Vent Pipe Install the Log Set Air Shutter Adjustment Air Shutter AdjustmentAir Shutter Adjustment Instructions Connect the Gas Supply LineRemove stove front Install the Stove Front Complete the AssemblyInstall ON/OFF Switch Thermostat Connection optionalOperation Flame & Temperature AdjustmentFlame Characteristics Your First FireLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting / Honeywell #8420 Gas Control System Symptom Possible Causes Corrective ActionFuel Conversion Instructions Conversion PrecautionsConversion Procedure Pilot TypeInjector Orifice Size Matrix Conversion to LP Input BTU/hMaintenance Inspect the Vent System Annually Gasket ReplacementStove Disassembly Check the Gas Flame RegularlyWiring Diagrams BLKJefferson Direct Vent/Natural Vent Gas Heater DescriptionDescripción Fuel Conversion KitsFan Kits Optional AccessoriesRemote Controls Decorative Rings3636 Jefferson Direct Vent /Natural Vent Gas Heater 3838 CFM Corporation Toll Free Efficiency Ratings Model EnerGuide Ratings Fireplace Efficiency %