Century Jefferson manual Complete the Assembly, Install ON/OFF Switch, Install the Stove Front

Page 24

Jefferson Direct Vent/Natural Vent Gas Heater

Left Burner Leg

Injector Orifices

90°

ST353a

Fig. 41 Remove and replace injector orifices.

Complete the Assembly

Open the swiveling latches (cams) on the top left and right corners of the glass frame.

Position the glass and frame against the firebox by placing the bottom edge on the brackets on the bot- tom face of the firebox.

Swing the assembly against the firebox, and close the latches firmly against the pins protruding from the firebox top.

Install ON/OFF Switch

The switch assembly parts are found in the parts bag.

1.Attach switch assembly to left rear side of stove shroud (when facing shroud) using two screws and existing holes in shroud. (Fig. 42)

2.Run wires down back of stove, under bottom of rear shroud to valve.

3.Attach wires to valve terminals. (Fig. 43)

Install the Stove Front

The front panel attaches to the stove by four (4) steel tabs that engage with corresponding cast ribs on the sides and bottom of the stove body. Position the front about 3” down from the stove top and lift the plate to engage the upper tabs behind the adjacent ribs on the side. (Fig. 44) Then lower the plate into position, so the lower tabs engage with the corresponding ribs at the bottom. (Fig. 45)

When properly installed, the bottom of the stove front cannot be pulled away from the sides without also lifting it.

Upper Tabs

3” (76 mm)

Control

Door

Lower Tabs Engage

 

Ribs in bottom

ST229

Fig. 44 Install stove front.

Side Rib

Switch As-

semblyExisting Holes

Front Tab

Stove Side

Screws

ST315

 

Fig. 42 Attach switch assembly to rear shroud.

PILOT

 

ADJ

 

TPTH

 

TP

 

TH

ST228

 

Fig. 43 Attach switch wires to valve.

Stove Front

ST279

Fig. 45 Engage with side ribs.

Thermostat Connection (optional)

Use only a thermostat rated for 500 - 750 millivolts.

Check the table below for the appropriate gauge ther- mostat wire to use for the length of lead required in your installation.

Thermostat

 

Wire / Gauge

Maximum Run

18

20 feet

16

20 - 40 feet

14

up to 60 feet

1.Install the wall thermostat in the desired location and run the wires to the stove location. Terminate these leads with 1/4” female connectors.

2.Connect the thermostat wires to the valve. (Fig. 43)

2424

30004177

Image 24
Contents Jefferson Direct Vent/Natural Vent Gas Heater Table of Contents Installation & Operating Instructions Requirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedJefferson Direct Vent/Natural Vent Stove Dimensions Jefferson dimensionsInstallation Requirements Locating The StoveClearance Requirements Wall Centerline from Floor Wall and Ceiling ClearancesHearth Requirements Gas Specifications Gas Inlet and Manifold PressuresHigh Elevations Horizontal Termination Direct Vent onlyRestictor Plate is used on Direct Vent installations only Vertical Termination Direct Vent onlyVent Termination Clearances Location of Vent Termination Canadian Installations1 US Installations2 General Venting Information Termination LocationVenting Requirements Natural Vent Only Termination ClearancesVenting Requirements and Options Direct Vent only Approved Vent System ComponentsAssembly Procedures Install the Optional FanTools Required Unpack the StoveVenting System Assembly Direct Vent General Information Install the Vent Adapter PipeFor Canadian installations The venting system must Attach the Inner Vent Assembly to the stove Attach inner assembly to flue collarSide Wall Termination Assembly Simpson Dura-Vent install outer adapter pipeVent Termination Below Grade Measure the horizontal lengthVertical Through the Roof Vent Assembly Venting System Assembly Natural Vent General InformationInstall the Vent Pipe Install the Log Set Air Shutter Adjustment Air Shutter Adjustment InstructionsAir Shutter Adjustment Connect the Gas Supply LineRemove stove front Complete the Assembly Install ON/OFF SwitchInstall the Stove Front Thermostat Connection optionalFlame & Temperature Adjustment Flame CharacteristicsOperation Your First FireLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting / Honeywell #8420 Gas Control System Symptom Possible Causes Corrective ActionConversion Precautions Conversion ProcedureFuel Conversion Instructions Pilot TypeInjector Orifice Size Matrix Conversion to LP Input BTU/hMaintenance Gasket Replacement Stove DisassemblyInspect the Vent System Annually Check the Gas Flame RegularlyWiring Diagrams BLKJefferson Direct Vent/Natural Vent Gas Heater DescriptionDescripción Fuel Conversion KitsOptional Accessories Remote ControlsFan Kits Decorative Rings3636 Jefferson Direct Vent /Natural Vent Gas Heater 3838 CFM Corporation Toll Free Efficiency Ratings Model EnerGuide Ratings Fireplace Efficiency %