Heatiator CL36D •TR342 Round Telescoping Termination Cap, •TS345/TS345P Square Termination Cap

Page 34
•TR342 Round Telescoping Termination Cap

TR342 Round Telescoping Termination Cap

TS345/TS345P Square Termination Cap

Assemble

Termination

storm collar

Cap

around extended

 

termination cap

 

pipe

 

once cap is

 

installed.

Do NOT

 

Caulk gaps between

block air

holes

storm collar & pipe,

Storm

and storm collar

Collar

& chase top.

3 clip brackets.

 

Slip over chase collar

 

and attach with screws

 

provided.

Collar

 

2 in. (51 mm)

14 1/2 in. (368 mm)

Minimum Height

Maximum

 

Chase Top

 

Chase

Collar

2 in. (51 mm)

Minimum Height

Chase Top

Place waterproof sealer under each flange of the termination cap and on top of each screw to help prevent leaks.

Termination Cap

The last section of pipe must stop between 2 in. (51 mm) above the top of the chase and 4 3/4 in. (121 mm) below the top of the chase.

2 in. (51 mm)

maximum

4 3/4 in. (121 mm)

maximum

Chase

Chimney

Pipe

Chimney

Pipe

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

Figure 9.5 Installing a TR342 Round Telescoping Termination Cap

ST375 Square Termination Cap

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm).

Figure 9.7 Installing a TS345/TS345P Square Termination Cap

TCT375 Terra Cotta Cap

Flange

Termination Cap

Collar

2 in. (51 mm)

Minimum Height

Chase Top

Chimney

Pipe

Place waterproof caulk or sealer under each flange of the termination cap and on top of each screw to help prevent leaks.

The last section of pipe must stop between 2 in. (51

mm)above the top of the chase and 4 3/4 in. (121

mm) below the top of the chase.

2 in. (51 mm)

maximum

4 3/4 in. (121 mm)

maximum

Chase

 

Place waterproof sealer

Remove 2 screws

under each flange of the

termination cap and on

from front & back

top of each screw to

to lift the top off

help prevent leaks.

 

Termination Cap

The last section of pipe

 

must stop between 2 in.

 

(51 mm) above top of

Collar

chase and 7 in. (178 mm)

below top of chase

2 in. (51 mm)

 

Minimum Height

 

Chase Top

2 in. (51 mm)

 

7 in. (178 mm)

 

Chase

Chimney

 

Pipe

 

Termination cap pipe and chimney section must overlap

1-1/2 in. (38 mm)

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

Figure 9.6 Installing an ST375 Square Termination Cap

Figure 9.8 Installing a TCT375 Terra Cotta Cap

34

Heatilator • CL36D, CR36D • 12538 • Rev Z 7/12

Image 34
Contents Owner’s Manual Wood Burning FireplaceModels CL36D CR36D Listing Label Information/Location CongratulationsHomeowner Reference Information FIREPLACE NOSafety Alert Key Table of ContentsInstaller Guide User GuideWARRANTY COVERAGE Limited Warranty Hearth & Home Technologies IncLIMITED LIFETIME WARRANTY WARRANTY PERIODThis warranty is void if WARRANTY CONDITIONSWARRANTY EXCLUSIONS LIMITATIONS OF LIABILITYB. Non-CombustibleMaterials 1Listing and Code ApprovalsA. Appliance Certification C. Combustible MaterialsA. Your Fireplace User Guide2Operating Instructions Hot glass will cause burnsD. Grate B. Seasoned WoodC. Starting a Fire E. FirescreenJ. Vented Gas Log Sets & Gas Log Lighters H. Glass DoorsI. Outside Air optional K. Optional ComponentsMoisture M. Wood FuelHardwood vs Softwood Seasoned WoodA. Disposal of Ashes 3Maintenance and ServiceB. Chimney Inspection/Cleaning Creosote - Formation and Need for RemovalD. Inspect Grate E. Glass CleaningC. Check Firebox Refractory Frequency: As desiredSolution 4Troubleshooting GuideStart Fire Problems Possible CauseA. Typical Fireplace System Installer Guide5Getting Started •Illustrations/diagrams are not drawn to scaleC. Draft B. Design and Installation ConsiderationsD. Negative Pressure E. Locating Fireplace & Chimney G. Fireplace System Requirements F. Tools and Supplies NeededH. Inspect Fireplace and Components 6Framing & Clearances A. Select Fireplace LocationB. Clearances Heatilator • CL36D, CR36D • 12538 • Rev Z 7/1239 deg C. Sidewalls/Surrounds20 in 50 degD. Frame the Fireplace B. Position the Fireplace 7Installation of FireplaceA. Things to Consider C. Place Protective Metal Hearth StripsCanada Note: Chimney air kit notshown, but required in Heatilator • CL36D, CR36D • 12538 • Rev Z 7/12E. Install Outside Air Kit 8Chimney Assembly A. Chimney Requirements TableTable B. Using Offsets/ReturnsExample E. Install Ceiling Firestops D. Install Chimney Air KitC. Assemble Chimney Sections F. Install Attic Insulation Shield I. Install Flashing H. Complete InstallationG. Cut out Hole in Roof J. Chimney Termination Requirements 9Chase Installations A. Construct the ChaseC. Install Chase Top B. Install Fireplace & ChimneyD. Install Termination Cap •Warning! Risk of Fire! The minimum overlap of•ST375 Square Termination Cap •TR342 Round Telescoping Termination Cap•TS345/TS345P Square Termination Cap •TCT375 Terra Cotta CapA. Radiation Shield 10 ShroudsB. Field Constructed Shrouds Roofed Style Shroud radiation shield required Figure 10.4 Roofed Style Shroud DimensionsMailbox Style Shroud radiation shield required Heatilator CL36D, CR36D 12538 Rev Z 7/12B. Combustible Materials 11 FinishingA. Non-combustibleMaterials C. Hearth ExtensionD. Finishing Material Warning! Risk of FireE. Combustible Mantel MantelSidewalls/Surrounds B. Wood Burning Inserts 12 AccessoriesA. Gas Log/Lighter Provision Gas Code, ANSI Z223.113 Reference Materials A. Fireplace DimensionsB. Optional Components C. Chimney Components Catalog #14-1/2in 368 mmHeatilator • CL36D, CR36D • 12538 • Rev Z 7/12 Stocked D. Service PartsCL36D at DepotStocked D. Service Parts continuedCR36D at DepotDO NOT DISCARD THIS MANUAL – NOTES –E. Contact Information DO DISCARDNOT
Related manuals
Manual 48 pages 11.28 Kb