Hearth and Home Technologies ESCAPE-42DV PVK-80 Motor Neutral Vacuum Switch 120VAC HOT

Page 32

 

PVK-80 MOTOR

 

 

NEUTRAL

 

 

 

 

 

 

 

 

 

 

 

 

 

VACUUM SWITCH

 

120VAC HOT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(GREEN)

 

 

 

 

WHITE (HTL)

 

 

(ORANGE)

 

 

 

 

YELLOW (H&G)

 

 

 

 

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GROUND

 

 

 

GREEN

 

 

 

 

IPI

BLACK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VALVE

 

 

 

 

 

 

 

 

 

 

 

 

IPI PILOT

Y

R

 

 

REAR VIEW

 

 

IPI

 

G

R Y G

 

 

 

 

(BROWN)

 

 

 

 

 

MODULE

 

(BROWN)

 

 

 

 

 

 

 

 

 

(RED)

 

 

 

 

 

 

 

 

3V DC

(BLACK)

 

 

 

 

 

 

FLAME

 

 

 

 

 

 

 

 

 

SOLENOID

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FRONT VIEW

 

 

 

(RED)

 

 

 

 

 

 

 

 

FLAME ON

(RED)

 

 

 

 

 

 

 

 

 

(ORANGE)

 

(YELLOW)

 

 

 

 

FLAME HIGH/LOW

(ORANGE)

 

FACTORY

 

(BLACK)

 

 

 

 

 

 

(BLACK)

 

 

 

CONNECTED

 

(WHITE)

 

 

 

 

 

TOGETHER

FIREBOX

 

FAN

 

 

(YELLOW)

 

(GROUND)

 

 

 

 

 

 

 

 

CONNECTION

 

 

FAN THEMOSTAT

 

 

 

 

(BLACK)

 

 

 

 

TO HEAT ZONE

 

 

 

 

 

 

 

 

 

 

AC

 

(BLACK)

 

 

 

 

 

 

 

PLUG

 

AUX

 

 

 

 

 

 

 

 

 

PLUG-ADP

BACK

 

 

 

GROUND PIGTAIL

CONNECTION

 

 

 

 

LIGHT 1

 

 

 

GREEN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

JUNCTION BOX

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BACK

 

 

 

 

 

 

 

 

 

LIGHT 2

Figure 10.2 IPI Wiring diagram for optional PVK-80 power vent termination cap

 

 

 

 

32

Heat & Glo • Escape-42DV2052-900 Rev. R • 10/08

Image 32 Contents
Hot glass will cause burns ModelWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Inspect Firebox Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections Hearth ExtensionSee .4 for specific clearances Termination LocationsVent Termination Minimum Clearances Alcove Applications Vent Information and Diagrams Vent Table KeyMeasuring Standards Use of ElbowsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Top Vent Vertical Termination Three Elbows Ht MaxVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Securing and Leveling the Appliance Removing Non-combustible Facing Mate- rial AssemblyAppliance Preparation Installing Non-combustible Facing Material Attaching Non-combustible Facing MaterialInstalling Vent Pipe Assembly of Vent SectionsAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical Sections Heat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Installing Roof Flashing and Vertical Termination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 17 Assembling the Storm Collar Around the Pipe Gas Information Fuel Conversions Gas Connection Gas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Recommendation for Wire Intellifire Ignition System WiringConnecting to the Appliance Optional Accessories RequirementsDetail a PVK-80 Motor Neutral Vacuum Switch 120VAC HOT Finishing Facing MaterialFinishing Materials Requirements Non-combustible Finishing Material RequirementsAppliance Setup Clean the ApplianceAccessories Ember PlacementPositioning the Logs StepLOG #1 SRV750-706 Three LOG #2 SRV569-705 TwoLOG #5 SRV2012-163 LOG #3 SRV2052-701LOG #4 SRV2012-162 LOG #6 SRV2052-702 LOG #7 SRV2012-165LOG #8 SRV2012-166 Final StepGlass Assembly Air Shutter SettingRemoving Glass Assembly Replacing Glass AssemblyOperating Instructions Before Lighting ApplianceTurn off all electric power to the appliance On position. The ON/OFF switch mayLighting Appliance IPI Ignition Final inspection byAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsLocation Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsDVP-TRAP RF6M RF12M Part number list on following Log Set AssemblyService Parts At Depot Service Parts ListStocked IPI Valve Assembly StockedCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information