Hearth and Home Technologies ESCAPE-42DV LOG #6 SRV2052-702, LOG #7 SRV2012-165, Final Step

Page 39

LOG #6 (SRV2052-702):

Place log #6 on the left side of the grate with the groove on the end of the log fitting into the vertical left grate tine. The other end has a slot in the bottom side. This slot fits over the metal tab in log #3.

LOG #7 (SRV2012-165):

Place log #7 on top of log #6. The groove in the front side of the log fits into the second vertical tine from the left of the grate. The center of the log rests in the flat spot on log #6.

LOG #8 (SRV2012-166):

Place log #8 on top of log #5. The flat bottom of log #8 sits on the large flat area of log #5. The burned end of log #8 rests on the second vertical tine from the right of the grate. The tine fits on the burned out groove on the left end of the log.

Final Step:

Place MYSTIC EMBERS gener- ously around on the floor of the fireplace. Do NOT put Mystic em- bers on the burner surface around the ports. Place embers around the pilot wires to disguise the wires from view.

63

7

6

5

8

Heat & Glo • Escape-42DV2052-900 Rev. R • 10/08

39

Image 39 Contents
Model What to do if you smell gasHot glass will cause burns Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Inspect Firebox Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseHearth Extension Mantel ProjectionsTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Alcove Applications Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsH1+ H2 Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsTop Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Top Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingInstalling the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationSecuring and Leveling the Appliance Attaching Non-combustible Facing Material Installing Non-combustible Facing MaterialAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsDisassembly of Vent Sections Securing the Vent Sections Vertical SectionsHorizontal Sections Installing Heat Shield and Horizontal Termination Cap Installing the Horizontal Termination CapHeat Shield Requirements for Horizontal Termination flue of the pipe see Figure Installing Roof Flashing and Vertical Termination Cap17 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Optional Accessories Requirements Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceDetail a PVK-80 Motor Neutral Vacuum Switch 120VAC HOT Facing Material FinishingNon-combustible Finishing Material Requirements Finishing Materials Requirements Ember Placement Appliance Setup Clean the Appliance AccessoriesStep Positioning the LogsLOG #2 SRV569-705 Two LOG #1 SRV750-706 ThreeLOG #3 SRV2052-701 LOG #4 SRV2012-162LOG #5 SRV2012-163 Final Step LOG #6 SRV2052-702LOG #7 SRV2012-165 LOG #8 SRV2012-166Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyBefore Lighting Appliance Operating InstructionsFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Appliance IPI IgnitionFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksAppliance Dimension Diagram Reference MaterialsLocation Inches Millimeters DVP vent components Vent Components DiagramsDVP-TRAP RF6M RF12M Log Set Assembly Service PartsPart number list on following Service Parts List StockedAt Depot Stocked IPI Valve AssemblyCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information