4 Termination Locations

A. Vent Termination Minimum Clearances

HORIZONTAL OVERHANG

WARNING

Fire Risk. Explosion Risk.

Inspect external vent cap regularly.

Ensure no debris blocks cap.

Combustible materials blocking cap may ignite.

Restricted air flow affects burner operation.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

VERTICAL

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

(See Figure 4.4 for specific clearances)

Figure 4.1

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.2 Minimum height from roof to lowest discharge opening

Figure 4.2 specifies minimum vent heights for various pitched roofs.

GAS, WOOD OR FUEL

 

OIL TERMINATION

B

 

GAS

CTERMINATION

A

 

Gas

Wood & Fuel Oil

Comments

 

Termination

Termination

 

 

 

 

 

 

A

6 in.

20 in. min.

Horizontal distance between terminations

 

 

 

 

B

20 in.

24 in. min.

Distance to perpendicular wall

 

 

 

 

C

18 in.

18 in.

Vertical distance between terminations

 

 

 

 

Figure 4.3 Multiple Vertical Termination

Heat & Glo • Escape-42DV2052-900 Rev. R • 10/08

11

Image 11 Contents
Hot glass will cause burns ModelWhat to do if you smell gas Homeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Inspect Firebox Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseHearth Extension Mantel ProjectionsSee .4 for specific clearances Termination LocationsVent Termination Minimum Clearances Alcove Applications Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsH1+ H2 Vent DiagramsTop Vent Horizontal Termination One Elbow Two ElbowsTop Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Top Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Securing and Leveling the Appliance Removing Non-combustible Facing Mate- rial AssemblyAppliance Preparation Attaching Non-combustible Facing Material Installing Non-combustible Facing MaterialAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical Sections Heat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap flue of the pipe see Figure Installing Roof Flashing and Vertical Termination Cap17 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarPressure Natural Gas Propane Gas InformationFuel Conversions Gas Connection Gas PressuresHigh Altitude Installations Optional Accessories Requirements Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceDetail a PVK-80 Motor Neutral Vacuum Switch 120VAC HOT Facing Material FinishingNon-combustible Finishing Material Requirements Finishing Materials RequirementsEmber Placement Appliance SetupClean the Appliance AccessoriesStep Positioning the LogsLOG #2 SRV569-705 Two LOG #1 SRV750-706 ThreeLOG #5 SRV2012-163 LOG #3 SRV2052-701LOG #4 SRV2012-162 Final Step LOG #6 SRV2052-702LOG #7 SRV2012-165 LOG #8 SRV2012-166Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyBefore Lighting Appliance Operating InstructionsFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Appliance IPI IgnitionAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksLocation Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP-TRAP RF6M RF12M Part number list on following Log Set AssemblyService Parts At Depot Service Parts ListStocked Stocked IPI Valve AssemblyCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information