Hearth and Home Technologies QVI-25FB-S Check Pilot Flame Appearance, After Appliance is Lit

Page 27

C. Check Pilot Flame Appearance

Pilot flame must contact the thermocouple and thermopile for reliable appliance operation.

Pilot flame should be as shown in Figure 12.1.

Figure 12.1 Proper Pilot Flame

If adjustment is needed remove cap screw from gas valve using 1/8 inch standard screwdriver (see Figure 12.2).

Turn adjustment screw clockwise to increase pilot flame size. Make small adjustments.

PILOT

ADJUSTMENT

Figure 12.2 Adjustments

Do NOT turn adjustment screw counter-clockwise too far as it will come out of the valve allowing gas to escape.

Replace cap screw and seal to prevent gas leaks.

Check for gas leaks after tightening.

D. After Appliance is Lit

WARNING

Glass door must be in place when appliance is operating.

Risk of:

Combustion Fumes

Fire

Do NOT operate appliance with glass door removed.

Open viewing glass for servicing only.

Glass door MUST be in place and sealed before operating appliance.

Only use glass door certified for use with appliance.

Glass replacement should be done by qualified technician.

Initial Break-in Procedure

When you light the appliance, you may notice that it pro- duces heat which does have an associated odor or smell. If you feel this odor is excessive it may require the initial three to four hour continuous burn on high followed by a second burn up to 12 hours to fully drive off any odor from paint and lubricants used in the manufacturing process. Condensation of the glass is normal.

Note: The appliance should be run three to four hours on the initial start-up. Turn it off and let it cool completely. Remove and clean the glass. Replace the glass and run the appliance for an additional 12 hours. This will help to cure the products used in the paint and logs.

During this break-in period it is recommended that some windows in the house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the appliance’s initial burning.

Quadra-FireQVI-25FB-S2031-910 Rev. E • 9/08

27

Image 27 Contents
Model What to do if you smell gasHOT Surfaces Xxxxxxxx Homeowner Reference InformationTable of Contents Listing and Code Approvals Tools and Supplies Needed Design and Installation ConsiderationsGetting Started Inspect Appliance and ComponentsMinimum Fireplace Opening Fireplace Size RequirementsClearances to Mantels or other Combustibles above Appliance ClearancesVent Termination Minimum Clearances Termination LocationsMeasuring Standards Vent Information and DiagramsVent Table Key Horizontal VentingInstallation Preparation Installing Vent Pipe and Appliance Connecting Vent PipeVenting Components Class a Wood Pipe Inlet AIR Vent Pipe Stainless Steel Placing, Securing and Leveling the Appliance Damper Flashing Kit Optional Installing Adaptor and Termination CapMasonry Factory Built Wood BurningGas Information Fuel Conversions Gas ConnectionGas Pressures Check for GAS Leaks High Altitude InstallationsAppliance Requirements Wiring the ApplianceON/OFF Switch Electrical InformationJunction Box Installation Installation for Fan OptionalOptional Accessories Fan Wiring Diagram Mantel Projections FinishingEmber Placement Appliance SetupClean the Appliance AccessoriesLog Set Assembly LOGS-2031 Log PlacementPositioning the Logs Quadra-Fire QVI-25FB-S 2031-910 Rev. E 9/08 Replacing Glass Assembly Glass AssemblyAir Shutter Setting Removing Glass AssemblyOperating Instructions Before Lighting ApplianceBefore operating this appliance have a qualified technician Lighting Appliance Standing Pilot IgnitionWhat to do if YOU Smell GAS After Appliance is Lit Initial Break-in ProcedurePilot Adjustment Check Pilot Flame AppearanceIssue Solutions Frequently Asked QuestionsTroubleshooting Symptom Possible Causes Corrective ActionStanding Pilot Ignition System Symptom Possible Cause Corrective Action TroubleshootingMaintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksAppliance Dimension Diagram QVI-25FB-S Model DimensionsReference Materials Direct Vent Flex Liner Kits Vent Kits ComponentsPart number list on following Log Set AssemblyService Parts List 119 1312Service Parts StockedAt Depot Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information