3.Place linkage control arm over timer shaft and tighten set screw. Figure 37.1.
Tighten set screw
Figure 37.1
4.Rotate linkage control arm into final position and re- attach to mounting plate. Note that the D cut is now facing the linkage timer arm.
Attach to
Mounting
Plate
Attach Linkage
Timer Arm
“D” cut is not facing the Linkage Arm
Figure 37.2
Figure 37.3 Exploded View of Entire Assembly for Point of Reference only
Item | Description | Qty |
|
|
|
1 | Screw | 2 |
|
|
|
2 | Screw | 2 |
3 | Washer SAE #10 | 2 |
4 | Bushing | 2 |
5 | Linkage Control Arm | 1 |
Item | Description | Qty |
|
|
|
6 | Attachment Nut & Set Screw | 1 |
7 | Linkage Timer Arm | 1 |
8 | Door Linkage | 1 |
9 | Timer, Mechanical, 12 hours | 1 |
10 | Mounting Bracket | 1 |
September 1, 2008 | Heat & Glo • NorthStar EPA Fireplace • | Page 37 |