Hearth and Home Technologies 5100-I Wood Insert Clearances to Combustibles

Page 5

R

5100-I WOOD INSERT

CLEARANCES TO COMBUSTIBLES

United States and Canada

 

 

Mantel

 

SideWall

B

Fascia or Trim

 

C

 

 

 

 

 

A

Insert

D

 

 

 

 

 

 

F

E

 

Hearth Extension

In Canada a full length 6” (152mm) S635 flue liner required as per ULC S628.

NOTE: When installling into a masonry fireplace, the fire- place must be built to UBC Chapter 37 standards. Do not remove brick or mortar from masonry fireplace to accomo- date insert. The permanent metal warning plate provided must be attached to the back of the fireplace stating the fire- place may have been altered to accomodate the insert and must be returned to original condition for use as a conven- tional fireplace.

 

A

B

C

D

E

F

 

 

INSTALLATION: Masonry, Heat Circulating and *Zero Clearance

 

 

 

 

12" (305)

40" (1016)

35" (889)

7" (178)

16" (406)

8"(200)

 

 

 

 

 

 

18" (457) Canada

 

 

 

 

 

 

 

 

 

With 5" Mantel Deflector, Part No. 831-1520

 

 

 

 

 

 

 

 

 

 

 

 

 

12" (305)

29" (737)

20" (889)

7" (178)

16" (406)

8"(200)

 

 

 

 

 

 

18" (457) Canada

 

 

 

 

 

 

 

 

 

With 8" Mantel Deflector, Part No. 831-1530

 

 

 

 

 

 

 

 

 

 

 

 

 

12" (305)

23" (585)

16" (406)

7" (178)

16" (406)

8"(200)

 

 

 

 

 

 

18" (457) Canada

 

 

*Zero Clearance in USA Only.

THERMAL PROTECTION USA & CANADA

Thermal protection must be 1 inch (25mm) minimum thickness (“k” value = 0.84) or equivalent material. See Alternate Floor Protection Work Sheet on page 7.

SERIAL NUMBER LABEL LOCATION:

ON RIGHT SIDE OF INSERT AS YOU FACE THE APPLIANCE

January 30, 2004

250-1960 Rev B

Page 5

Image 5
Contents Wood Insert Dan Henry Wood InsertWood Insert Safety & Overview of Appliance Side View TOP ViewThermal Protection USA & Canada Wood Insert Clearances to CombustiblesChimney HEIGHT/DRAFT Installation RecommendationsListings Alternate Floor Protection Worksheet General Installation ProcedureOvalizing Round Stainless Steel Liners Chimney RequirementsChimney Height Chimney TOP ViewInstallations Into Zero Clearance Fireplaces in Mobile Homes Masonry Fireplace Using DIRECT-CONNECT Method Installation OptionsFactory Built Zero Clearance Fireplace USA Installatons onlySecuring Liner to Chimney Ring Installation in CanadaUSE of Leveling Bolts Blower Cord Location Outside AIR InstallationBlower Operation FAN Speed Control ADJUSTMENT, if Necessary Blower Replacement InstructionsWiring Diagram Panel and Trim SET Installation Zero Clearance Adjustable Trim SUPPORT, 2 to Wood Selection and Storage OverfiringBuilding a Fire ASH Removal Wood Insert Operating TipsFAN Operating Instructions Story of the Three Burning Stages AIR Quality and Your QUADRA-FIRE InsertMaintenance Baffle Brick Removal & Installation Brick Replacement InstructionsAppliances AccessoriesService Parts Lifetime Warranty Rev B January 30