Hearth and Home Technologies 5100-I Chimney Requirements, Ovalizing Round Stainless Steel Liners

Page 8

R

5100-I WOOD INSERT

CHIMNEY REQUIREMENTS

A chimney must be the required height above the roof or other obstruction for safety and for proper draft oper- ation. The requirement is that the chimney must be at least 3 feet (91cm) higher than the highest point where it passes through the roof, and at least 2 feet (61cm) higher than the highest part of the roof or structure that is within10 feet (305cm) of the chimney, measured hori- zontally. Refer to Figure 8C.

OVALIZING ROUND STAINLESS STEEL

LINERS

Ovalizing round stainless steel liners to acommodate the liner passing through the damper region of a fire- place is an allowable and acceptable practice.

Ensure that the ovalization is minimized to the extent required to fit through the damper.

Figure 8A

Firestopping

Non-Combustible

Firestopping

Material

Floor

2 inch

Figure 8C

10 ft

(305cm)

At least 2 ft

(51mm)

At least 3 ft

(91cm)

(61cm)

Floor

Ceiling

Caulk

CHIMNEY HEIGHT

(second Story)

Figure 8B

Minimum 1 inch (25mm) clearance from exterior chimney to sheathing

Figure 8D

Minimum 2 inch (51mm) clearance from combustible material

and insulation

ceiling

Non-combustible fire stopping material

CHIMNEY TOP VIEW

 

 

 

 

 

 

 

 

 

 

 

5/8" (16mm)

1/2" (12.7mm) airspace

Fireclay Flue

 

 

 

 

 

 

 

 

 

 

Liner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FLUE

 

 

 

 

Chimney Wall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4" (102mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nominal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Foundation

 

Page 8

250-1960 Rev B

January 30, 2004

Image 8
Contents Wood Insert Wood Insert Dan HenryWood Insert Safety & Overview of Appliance TOP View Side ViewWood Insert Clearances to Combustibles Thermal Protection USA & CanadaChimney HEIGHT/DRAFT Installation RecommendationsListings General Installation Procedure Alternate Floor Protection WorksheetChimney Requirements Ovalizing Round Stainless Steel LinersChimney Height Chimney TOP ViewInstallations Into Zero Clearance Fireplaces in Mobile Homes Installation Options Masonry Fireplace Using DIRECT-CONNECT MethodUSA Installatons only Factory Built Zero Clearance FireplaceSecuring Liner to Chimney Ring Installation in CanadaUSE of Leveling Bolts Blower Cord Location Outside AIR InstallationBlower Operation FAN Speed Control ADJUSTMENT, if Necessary Blower Replacement InstructionsWiring Diagram Panel and Trim SET Installation Zero Clearance Adjustable Trim SUPPORT, 2 to Wood Selection and Storage OverfiringBuilding a Fire ASH Removal Wood Insert Operating TipsFAN Operating Instructions AIR Quality and Your QUADRA-FIRE Insert Story of the Three Burning StagesMaintenance Brick Replacement Instructions Baffle Brick Removal & InstallationAppliances AccessoriesService Parts Lifetime Warranty Rev B January 30