Electrical Insulation Testing

Why perform electrical insulation testing?

Electrical insulation starts to age as soon as it's made. Harsh environments, especially those with extreme temperature changes and/or chemical contamination, cause further deterioration of the insulation (power cord).

As a result, personnel safety (electrocution/shock) and power reliability can suffer resulting in higher operating cost and maintenance.

What is Insulation Resistance Testing

Insulation resistance testing applies a regulated stabilized high voltage (Figure 24), typically 500 VDC or greater across a dielectric (power cord). Measuring the amount of leakage current flowing through the dielectric will yield a resistive measurement in megohms.

Insulating Material Testing

To verify the integrity of the pump's insulating material (power cable) it will be necessary to perform an electrical insulation test. Any electrical insulation must have the opposite characteristic as the conductor: it should resist the flow of current, keeping it within the conductor.

To measure the IR (current x resistance), the use of an IR tester must be employed.This IR tester is a portable device that is a resistance meter (ohmmeter) with a built in DC generator that develops a high DC voltage.

The high DC voltage from the IR tester is usually 500 VDC or more.This voltage, when applied causes a small current to flow through and over the insulation's surfaces.The tester provides a direct reading of IR in megohms.

Ahigh resistance reading would indicate a "good" insulation, meaning very little current is escaping through the insulation. While a relatively low resistance reading would indicate a poor insulation, meaning a significant amount of current may be leaking through and along the insulation.

NOTICE

Insulation resistance is moisture and temperature sensitive. When temperature increases, insulation resistance decreases, and vice versa.

When performing this test measurement, perform the test using the same test parameters as used in the initial testing.

20M ￿

POWER CABLE

 

 

INSULATION

M￿

 

 

 

V

 

OFF

 

 

￿

 

 

￿

K￿ SET

GROUND

 

UP

 

PIN

MEGGER™

 

500 VDC INSULATION

 

TEST METER

SUBMERSIBLE

 

 

PUMP

Figure 24. Insulation Tester Application

DANGER

Read and follow the manufacturer's users manual prior to operating insulation tester (megaohm meter). This meter generates a test voltage of 500 volts or greater. Only qualified and trained personnel should

use this equipment. The possibility exists of severe electrical shock, electrocution even death!, when using insulation tester.

page 26 — st3020b1/BCUL Sub. pump • operation and parts manual — rev. #2 (10/28/10)

Image 26 Contents
Model st3020b1/st3020bcul Table of Contents Submersible PumpChoose from three easy options Safety Information SaFetY messagesGeneraL saFetY PUmp saFetY „ do not attempt to thaw out a frozen pump by usingLiFting saFetY Power Cord/Cable SafetyControl box safety Grounding SafetyDimensions ST3020B1/BCUL Pump DimensionsUL/CSA SpecificationSST3020B1/BCUL Performance curve Pump Performance Curve„„CORROSION-RESISTANT STAINLESS-STEEL Shaft simplifies maintenanceGeneral information Components Submersible Pump ComponentsDirect power operation Direct Power OperationDesign Features Float switchesMechanical Float Switch How It WorksFloat Switches Mounting The Float SwitchesFloat switches control box Control Boxes CB6 and CB200Single For correct wiring to pump motor 1Ø, 230 VAC, add Power Input Cable to Control BOXHose Connections Pump Power Connections No Control BoxOperation Attaching Lifting RopePower Cord Requirements Control Box InstallationSingle-Phase Power Installation Input Control Box MountingConnecting Dual float Switch SW-1WOP To Control Box Connecting AC Power to the Pump Motor Module Electronic Overload Module Settings Reset Operation CB200 Control Box New Style Electronic Overload ModuleManual Operation Automatic OperationVerify that the control box power on light is OFF Operation/maintenanceCleanup Shut-DownRemove adjustment liner item Reassemble in reverse order MaintenanceImpeller/Mechanical Seal Replacement Remove impeller nut item 4 and washer itemElectrical Insulation Testing Why perform electrical insulation testing?Symptom SolutionCb6 wiring diagram TB1Cb200 wiring diagram ConnectionsExplanation of Code in Remarks Column Suggested Spare Parts To 3 UnitsPump assy Part Name QTY Remarks Motor assy Part Name Terms and Conditions of Sale Parts FreigHt poLiCYPage HERE’S HOW to GET Help