England's Stove Works 49-SHC22, 10-CDV, 49-TRC22 Finish, Glass, Auger Removal and Replacement

Page 19

Finish

This new unit has been painted with High-Temperature Paint that should retain its original look for years. If the unit should get wet and rust spots appear, the spots can be sanded with plain steel wool and repainted. We recommend this paint, as others may not adhere to the surface or withstand the high temperatures.

Glass

This unit has a ceramic glass (Part # AC-G10, comes with gasket) in the viewing door. Surface scratches are acceptable, but if this glass becomes cracked in any area, the unit should be shut down and the window replaced with this high-temperature ceramic glass.

Auger Removal and Replacement

To remove the auger from the unit, you will first need to make sure that the unit has been shut down, unplugged and is cold.

IMPORTANT: Before removing the auger you will also need to remove any fuel that is in the hopper, including any sawdust or fines. Using a pair of regular pliers, simply grab the front part of the auger and pull forward.

To reinstall the auger, put the “notched” end of the auger into the tube and rotate clockwise until you feel the auger lock.

Illustration 3

19

Image 19
Contents Must be maintained Model Numbers 10-CDV 49-TRC22 49-SHC22Wishing you years of efficient, quality and comfy heating Important Information Important Notice Important Information Read Before Operating Unit PreparationPage Page Do not Connect to ANY AIR Distribution Duct or System Burning Solid Fuels Setting the StirrerWood Pellets Be sure to check local codes in your area Flue SystemThrough the Ceiling Mobile Home InstallationOutside Air Outside Combustion Air Intake Floor Protection Floor and Wall ProtectionWall Protection Operating Instructions START- UP ProceduresPellet START-UP Procedure Corn START-UP ProcedureTo remove the stirrer for burning pellets Codes SHUT-DOWN ProcedureDaily Operation ASH Removal and Disposal Annual CleaningAsh Pan Semi-Weekly Ash Removal Maintenance Finish Auger Removal and ReplacementGlass Recommended Heat Ranges Control BoardComponent Operation Start Operation END Circuit Board FunctionsAC-118, AC-118BN Window Trim Accessory ItemsThermostat AC-117, AC-117BN Lip TrimBox Parts Orders only Monroe, VA Questions Fax Replacement PARTS, Accessories and OptionsCustomer Service Department OptionsCorn Stove Exploded View Diagram Illustration Adjusting your Hopper Lid Latch Directions for Installation Legs or Pedestal Dimensions of your corn/pellet unitProblem Cause Solution TROUBLE-SHOOTING GuideProblem Warranty is not Transferable Page Unit Information Dealer Information