England's Stove Works 49-TRC22, 10-CDV, 49-SHC22 Dimensions of your corn/pellet unit

Page 26

Ash Pan Latch

Illustration 8

Dimensions of your corn/pellet unit:

28”W x 33”H x 28”D

350 lbs.

(Approx.18” height from floor to center of exhaust)

Illustration 9

Base Options and Details

DIRECTIONS FOR INSTALLATION OF

LEGS OR PEDESTAL:

(Stove must be cooled and all ashes cleaned out)

*Remove bricks, disconnect flue, and turn stove on its back.

*If you are replacing existing legs or pedestal, disconnect the existing legs or pedestal.

To install legs:

1. Each leg will fit into a pre-made slot on each corner of the bottom of the unit.

2. A 3/8” x 1-1/2” Carriage Bolt and matching nut is supplied with each leg. Fit a leg into a slot, and match the hole on the leg with the hole in the slot. Attach the legs one at a time, using the supplied bolts and nuts. Tighten securely.

To install pedestal:

1.Place spacers (provided) between the slots on the unit and the pedestal base (one spacer will fit on each side of the pedestal). Match the four holes in the pedestal (2 on each side) with the holes in the

spacers and slots on the unit.

2. Use the four 3/8” x 1-1/2” Carriage Bolts and nuts (provided) to attach the pedestal to the base of the stove. Tighten securely.

*After attaching the legs or pedestal, turn unit upright, reconnect flue and replace bricks according to manual.

26

Image 26
Contents Model Numbers 10-CDV 49-TRC22 49-SHC22 Must be maintainedWishing you years of efficient, quality and comfy heating Important Information Important Notice Unit Preparation Important Information Read Before OperatingPage Page Do not Connect to ANY AIR Distribution Duct or System Wood Pellets Setting the StirrerBurning Solid Fuels Flue System Be sure to check local codes in your areaOutside Air Outside Combustion Air Intake Mobile Home InstallationThrough the Ceiling Wall Protection Floor and Wall ProtectionFloor Protection START- UP Procedures Operating InstructionsTo remove the stirrer for burning pellets Corn START-UP ProcedurePellet START-UP Procedure SHUT-DOWN Procedure CodesDaily Operation Ash Pan Semi-Weekly Ash Removal Annual CleaningASH Removal and Disposal Maintenance Glass Auger Removal and ReplacementFinish Control Board Recommended Heat RangesCircuit Board Functions Component Operation Start Operation ENDAC-117, AC-117BN Lip Trim Accessory ItemsThermostat AC-118, AC-118BN Window Trim Options Replacement PARTS, Accessories and Options Customer Service Department Box Parts Orders only Monroe, VA Questions FaxCorn Stove Exploded View Diagram Illustration Adjusting your Hopper Lid Latch Dimensions of your corn/pellet unit Directions for Installation Legs or PedestalTROUBLE-SHOOTING Guide Problem Cause SolutionProblem Warranty is not Transferable Page Dealer Information Unit Information