England's Stove Works 49-SHC22, 10-CDV, 49-TRC22 operation manual Adjusting your Hopper Lid Latch

Page 25

Adjusting your Hopper Lid Latch

The seals around the top of the pellet hopper are important to safe an efficient operation of the unit. The latch installed on these units is designed to pull the hopper lid tight against this seal. Over the course of operation as these seals “wear in” and compress, the tension of the latch should be tested periodically, and adjusted if necessary.

To adjust the lid latch, the following tools will be needed; two ½ inch wrenches, or a ½ inch wrench and a ½ inch socket.

In order to adjust the latch, first open the hopper lid and then lock the latch in its closed position. Then take the ½ inch wrench and loosen the nut closest to the latch. This nut is then adjusted closer to the lid itself to tighten the latch. After adjusting this nut to the desired location, hold this nut in place with the ½ inch wrench, the tighten down the holding nut on the end of the latch shaft with the ½ inch socket or second wrench to hold the latching assembly in place

After tightening the latch, test the latch for proper tension by locking the lid down and lifting each front corner of the lid. The lid should be firmly held down by the latch. Repeat the same procedure if the latch is still not tight enough.

Illustration 7

Hopper Lid Latch

Important: Hopper Lid Latch must be checked periodically and kept tight so the top is sealed to prevent back-burn.

25

Image 25
Contents Must be maintained Model Numbers 10-CDV 49-TRC22 49-SHC22Wishing you years of efficient, quality and comfy heating Important Information Important Notice Important Information Read Before Operating Unit PreparationPage Page Do not Connect to ANY AIR Distribution Duct or System Burning Solid Fuels Setting the StirrerWood Pellets Be sure to check local codes in your area Flue SystemThrough the Ceiling Mobile Home InstallationOutside Air Outside Combustion Air Intake Floor Protection Floor and Wall ProtectionWall Protection Operating Instructions START- UP ProceduresPellet START-UP Procedure Corn START-UP ProcedureTo remove the stirrer for burning pellets Codes SHUT-DOWN ProcedureDaily Operation ASH Removal and Disposal Annual CleaningAsh Pan Semi-Weekly Ash Removal Maintenance Finish Auger Removal and ReplacementGlass Recommended Heat Ranges Control BoardComponent Operation Start Operation END Circuit Board FunctionsThermostat Accessory ItemsAC-117, AC-117BN Lip Trim AC-118, AC-118BN Window TrimCustomer Service Department Replacement PARTS, Accessories and OptionsOptions Box Parts Orders only Monroe, VA Questions FaxCorn Stove Exploded View Diagram Illustration Adjusting your Hopper Lid Latch Directions for Installation Legs or Pedestal Dimensions of your corn/pellet unitProblem Cause Solution TROUBLE-SHOOTING GuideProblem Warranty is not Transferable Page Unit Information Dealer Information