Secondary Installation
QUALIFIED INSTALLERS ONLY
REPLACING THE BLOWER:
1.Turn the unit off and allow the unit to cool completely.
2.Remove the fascia or louvers, open the door (see “DOOR REMOVAL”), and remove the log set.
3.Remove the log support tray by lifting the back of the tray up and pull it out from under the lip. Take care to not knock the pilot and the side brick panels.
4.Remove the centre and top brick panels (see “REMOVING THE BRICK PANEL”).
5.Turn gas supply off and remove gas connection. Disconnect the wiring from the side of the appliance.
6.Remove the three (3)
7.Remove the blower and housing from the gas tray assembly by removing the three (3) fastening screws located on the back of the gas tray assembly. Pull the fan out from under the gas tray. Disconnect the wiring from the fan temperature sensor and remove fan.
8.Hook up wires from the new blower to main wiring harness and fan temperature sensor. Install the blower in the reverse order as described in Step 7.
6.Reinstall the completed gas tray into the firebox, being careful not to damage any wires or gas lines. Properly secure the gas tray assembly in the firebox. Hook up gas lines and wiring harness. Perform a gas leak check on all gas line with a soap and water solution or an approved method.
7.Return unit to original location if moved. Re- install the log support tray, the brick panels, the logset (see “LOG SET AND
EMBER INSTALLATION”), the
door and the fascia or louvers.
8.Check burner and blower assembly for proper operation.
Burner Top with |
| |
Grate Attached |
| |
Gas & Electrical |
| |
Tray Complete |
| |
Log Support | Blower / Fan | |
Tray | ||
|
Figure 18: Removing burner and gas tray.
Caution: Bleed lines before lighting and light pilot with door open