Enviro 50-1578 technical manual 100mm

Page 11

Installation

CORNER THROUGH WALL INSTALLATION:

 

 

Fresh Air Intake

100mm

 

(4")

Wall thimble

 

manufactured

 

by pellet vent

 

manufacturer.

 

100mm

 

(4")

Figure 8: Corner Installation.

HORIZONTAL EXHAUST THROUGH WALL INSTALLATION:

Vent installation: install vent at clearances specified by the vent manufacturer.

A chimney connector shall not pass through an attic or roof space, closet or similar concealed spaces, or a floor, or ceiling. Where passage through a wall or partition of combustible construction is desired, the installation must conform with all local regulations, including those referring to regional, national or European Standards. Use 80mm stainless steel vent pipe to exhaust the unit to the outside.

1.Choose a location for your stove that meets the requirements stated in this manual and allows installation with the least amount of interference to house framing, plumbing, wiring, etc.

2.Install a non-combustible hearth pad (where necessary).

3.Place the appliance 375 mm (15”) away from the wall. If the stove is to be set on a hearth pad, set the unit on it.

4.Locate the center of the exhaust pipe on the stove. Extend that line to the wall. Once you have located the center point on the wall, refer to pellet vent manufacturer installation instructions for correct hole size and clearance to combustibles.

5.Install the wall thimble as per the instructions written on the thimble. Maintain an effective vapour barrier in accordance with local building codes.

6.Install a length of 80mm (3”) vent pipe into the wall thimble. The pipe should install easily into the thimble.

7.Install the fresh air intake (see OUTSIDE FRESH AIR CONNECTION).

8.Connect the exhaust vent pipe to the exhaust pipe on the stove. Seal the connection with high temperature silicone.

11

Image 11
Contents Windsor Table of Contents Safety Warnings & Recommendations Safety Warnings & Recommendations Safety Warnings & Recommendations Rating label is located on the back of the hopper InstallationWindsor Dimensions Windsor Specifications Depth 815mm Area Under Sundeck Exhaust 100mm With High Through Wall with Horizontal Termination Finally, extend the pellet Outside Vertical Installation Hearth Mount Side View Exhaust Box, slide the pipe To Supply Power to the Exhaust Blower Exhaust Blower Installation Vertical Termination Thermostat wire placement Special Notes Do not TroubleshootingExhaust motor will not function normally 200 F 93 C high limit temperature sensor has tripped Wiring Diagram Reference Description Part Number Parts List Components50-1577 Parts List Cast Components DiagramSCastteelParts Name of Owner Address Installation Data Sheet