Enviro 50-1578 technical manual Through Wall with Horizontal Termination

Page 13

Installation

VERTICAL RISE WITH HORIZONTAL TERMINATION INSTALLATION (RECOMMENDED):

A 45° elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).

Termination cap

 

90°elbow

 

Wall framing

 

Vertical section

 

of vent pipe

Wall strap

 

Horizontal frame

 

for thimble

 

 

Clean out tee

 

Wall thimble

������ �������

 

Figure 11: Through Wall with Horizontal Termination.

THROUGH CONCRETE WALL WITH VERTICAL RISE INSTALLATIONS:

A 45° down elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).

Installation to use if there is a concrete or retaining wall in line with exhaust vent on pellet stove.

The termination must be 305mm (12”) from the outside wall and 305mm (12”) above the ground.

Horizontal frame

 

for thimble

Termination

Wall thimble

cap

 

90°elbow

 

Wall framing

 

Vertical section

 

of vent pipe

 

 

Concrete

 

Wall

������ �������

Clean out tee

Figure 12: Vertical rise with Horizontal Termination.

13

Image 13
Contents Windsor Table of Contents Safety Warnings & Recommendations Safety Warnings & Recommendations Safety Warnings & Recommendations Rating label is located on the back of the hopper InstallationWindsor Dimensions Windsor Specifications Depth 815mm Area Under Sundeck Exhaust 100mm With High Through Wall with Horizontal Termination Finally, extend the pellet Outside Vertical Installation Hearth Mount Side View Exhaust Box, slide the pipe To Supply Power to the Exhaust Blower Exhaust Blower Installation Vertical Termination Thermostat wire placement Special Notes Do not TroubleshootingExhaust motor will not function normally 200 F 93 C high limit temperature sensor has tripped Wiring Diagram Reference Description Part Number Parts List Components50-1577 Parts List Cast Components DiagramSCastteelParts Name of Owner Address Installation Data Sheet